Suppr超能文献

临床工程生产力的管理与控制:一项案例研究

Management and control of clinical engineering productivity: a case study.

作者信息

Mahachek A R

出版信息

J Clin Eng. 1987 Mar-Apr;12(2):127-32. doi: 10.1097/00004669-198703000-00009.

Abstract

This paper describes, in chronological order, the steps taken to install productivity measurements and controls within the Clinical Engineering Department of a large teaching hospital. Motivation for this project involved both preparation for going "for profit" and the need to resolve an over-budget condition of labor cost. The project steps included current hospital management reports, database adequacy, supervisors' time logs, computerized budget spread sheets, testing changes on a financial simulation model, developing labor task standards, and departmental labor performance reporting. The project yielded significant positive results for the department's performance versus budget and also led to growth in supervisory and management skills.

摘要

本文按时间顺序描述了在一家大型教学医院的临床工程部门安装生产率衡量与控制措施所采取的步骤。该项目的动机既包括为实现“盈利”做准备,也包括解决劳动力成本超支的问题。项目步骤包括当前医院管理报告、数据库充足性、主管时间日志、计算机化预算电子表格、在财务模拟模型上测试变更、制定劳动任务标准以及部门劳动绩效报告。该项目在部门绩效与预算对比方面产生了显著的积极成果,还促进了监督和管理技能的提升。

文献AI研究员

20分钟写一篇综述,助力文献阅读效率提升50倍。

立即体验

用中文搜PubMed

大模型驱动的PubMed中文搜索引擎

马上搜索

文档翻译

学术文献翻译模型,支持多种主流文档格式。

立即体验