Suppr超能文献

将拆除水坝的选择制度化:新罕布什尔州的倡议。

Institutionalizing the option of dam removal: the New Hampshire initiative.

作者信息

Lindloff S D

机构信息

New Hampshire Department of Environmental Services, Water Division-Dam Bureau, 6 Hazen Drive, P.O. Box 95, Concord, NH 03302-0095, USA.

出版信息

Water Sci Technol. 2003;48(7):9-16.

Abstract

For two years, the State of New Hampshire has worked to institutionalize the option of dam removal. The high gradient streams that flow through the granite hills and mountains of this small northeastern state provided ideal conditions for dam construction, particularly during America's Industrial Revolution of the 1800s when mills were constructed throughout the area. With more than 4,800 dams in the state's database, there are many opportunities for the removal of dams that no longer serve a useful purpose, have become a public safety hazard and impact the river environment. Efforts to facilitate removal of dams in New Hampshire include the formation of a River Restoration Task Force and the creation of a dam removal program within the state agency responsible for regulating dams. This has led to the removal of two dams in the past year, with approximately ten additional projects in various stages of planning. A history of this agency-led initiative, as well as a discussion of the program's strengths, challenges and goals for the future are presented.

摘要

两年来,新罕布什尔州一直致力于将拆除水坝这一选择制度化。流经这个东北部小州花岗岩山丘和山脉的高坡度溪流为水坝建设提供了理想条件,尤其是在美国19世纪工业革命期间,当时该地区到处都建有工厂。该州数据库中有4800多座水坝,拆除那些不再有用、已成为公共安全隐患且影响河流环境的水坝有很多机会。新罕布什尔州为推动水坝拆除所做的努力包括组建河流恢复特别工作组,以及在负责监管水坝的州机构内设立水坝拆除项目。这导致在过去一年里拆除了两座水坝,还有大约十个项目处于不同的规划阶段。本文介绍了这一由该机构主导的举措的历史,以及对该项目的优势、挑战和未来目标的讨论。

文献AI研究员

20分钟写一篇综述,助力文献阅读效率提升50倍。

立即体验

用中文搜PubMed

大模型驱动的PubMed中文搜索引擎

马上搜索

文档翻译

学术文献翻译模型,支持多种主流文档格式。

立即体验