Suppr超能文献

用于柏林电子同步加速器(BESSY II)的正电子束团电磁波荡器。

The PTB electromagnetic undulator for BESSY II.

作者信息

Klein R, Bahrdt J, Herzog D, Ulm G

机构信息

Physikalisch-Technische Bundesanstalt, Abbestr. 2-12, D-10587 Berlin, Germany.

出版信息

J Synchrotron Radiat. 1998 May 1;5(Pt 3):451-2. doi: 10.1107/S0909049597013708.

Abstract

The Physikalisch-Technische Bundesanstalt (PTB) will operate an electromagnetic undulator designed for radiometry at the BESSY II storage ring. The undulator has a period length of 180 mm, 21 full periods and a maximum magnetic induction of 0.46 T, resulting in a tuning range of the first harmonic from 5 to 150 eV at 1.7 GeV electron energy. Moreover, the electromagnetic design allows the undulator to be operated in a special mode with the period length doubled to 360 mm, thus accordingly shifting the tuning range to lower energies. The main design parameters of the undulator for radiometric applications, as well as measured magnetic field data, are presented.

摘要

德国物理技术研究院(PTB)将在BESSY II储存环上运行一台专为辐射测量设计的电磁波荡器。该波荡器的周期长度为180毫米,有21个完整周期,最大磁感应强度为0.46特斯拉,在1.7 GeV电子能量下,其基波调谐范围为5至150电子伏特。此外,电磁设计使波荡器能够以一种特殊模式运行,周期长度加倍至360毫米,从而相应地将调谐范围转移到更低能量。本文介绍了用于辐射测量应用的波荡器的主要设计参数以及测量的磁场数据。

文献AI研究员

20分钟写一篇综述,助力文献阅读效率提升50倍。

立即体验

用中文搜PubMed

大模型驱动的PubMed中文搜索引擎

马上搜索

文档翻译

学术文献翻译模型,支持多种主流文档格式。

立即体验