Lee Sang-Hee, Yang Rou-Ling, Su Nan-Yao
Division of Industrial Mathematics, National Institute for Mathematical Sciences, Daejeon, South Korea.
Behav Processes. 2008 Nov;79(3):192-4. doi: 10.1016/j.beproc.2008.07.011. Epub 2008 Aug 14.
Subterranean termites move from place to place while foraging by tunneling through soil. During a period of foraging, they are likely to encounter a number of pre-formed tunnels created by, for example, tree roots or the breaking up of a zone of hard or compacted soil. We systematically observed the behavioral response of tunneling termites to such pre-formed, artificially constructed tunnels at widths, W, of 0.5, 1.0, 1.5, and 2.0mm, which mimicked pre-formed tunnels in the field. The two tunnels intersected at an angle, theta (=0 degrees , 10 degrees , 20 degrees , 30 degrees , 40 degrees , 50 degrees , and 60 degrees ) formed between the advance direction of a termite tunnel and the perpendicular direction of a pre-formed tunnel. For W=Wc (=0.5mm) and theta<or=theta c (=30 degrees ), the tunneling termites penetrated the pre-formed tunnel, whereas for all other combinations of W and theta investigated, the termite tunnel merged with the pre-formed tunnel. The implications of these findings are briefly discussed in relation to the minimum size of surface indentation that termites can recognize as a cue to tunnel.
地下白蚁在觅食时会通过在土壤中挖掘隧道从一个地方移动到另一个地方。在觅食期间,它们很可能会遇到一些预先形成的隧道,例如由树根形成的,或者是由坚硬或压实土壤区域的破碎形成的。我们系统地观察了挖掘隧道的白蚁对宽度W为0.5、1.0、1.5和2.0毫米的此类预先形成的人工建造隧道的行为反应,这些宽度模拟了野外的预先形成的隧道。两条隧道以白蚁隧道前进方向与预先形成的隧道垂直方向之间形成的角度θ(=0度、10度、20度、30度、40度、50度和60度)相交。对于W = Wc(=0.5毫米)且θ≤θc(=30度),挖掘隧道的白蚁会穿透预先形成的隧道,而对于所研究的W和θ的所有其他组合,白蚁隧道会与预先形成的隧道合并。结合白蚁能够识别为隧道线索的表面凹陷的最小尺寸,简要讨论了这些发现的意义。