Suppr超能文献

优化污泥管线管理以提高污水处理厂的磷回收量

Optimisation of sludge line management to enhance phosphorus recovery in WWTP.

作者信息

Marti N, Ferrer J, Seco A, Bouzas A

机构信息

Departamento Ingeniería Química, Universidad de Valencia, Doctor Moliner 50, 46100 Burjassot, Valencia, Spain.

出版信息

Water Res. 2008 Nov;42(18):4609-18. doi: 10.1016/j.watres.2008.08.012. Epub 2008 Aug 20.

Abstract

The management of the sludge treatment line can be optimized to reduce uncontrolled phosphorus precipitation in the anaerobic digester and to enhance phosphorus recovery in WWTP. In this paper, four operational strategies, which are based on the handling of the prefermented primary sludge and the secondary sludge from an EBPR process, have been tested in a pilot plant. The separated or mixed sludge thickening, the use of a stirred contact tank and the elutriation of the thickened sludge are the main strategies studied. Both the reduction of phosphorus precipitation in the digester and the supernatant suitability for a struvite crystallization process were assessed in each configuration. The mixed sludge thickening combined with a high flowrate elutriation stream reduced the phosphorus precipitation in the digester by 46%, with respect to the separate sludge thickening configuration (common practice in WWTP). Moreover, in this configuration, 68% of the soluble phosphorus in the system is available for a possible phosphorus recovery process by crystallization (not studied in this work). However, a high Ca/P molar ratio was detected in the resultant supernatant which is pointed out as a problem for the efficiency of struvite crystallization.

摘要

污泥处理生产线的管理可以得到优化,以减少厌氧消化池中不受控制的磷沉淀,并提高污水处理厂的磷回收量。本文在中试装置中测试了四种基于处理EBPR工艺中预发酵初沉污泥和二沉污泥的运行策略。主要研究的策略包括分离或混合污泥浓缩、使用搅拌接触池以及对浓缩污泥进行淘洗。在每种配置中,都评估了消化池中磷沉淀的减少情况以及上清液对鸟粪石结晶过程的适用性。与单独污泥浓缩配置(污水处理厂的常见做法)相比,混合污泥浓缩结合高流量淘洗流使消化池中的磷沉淀减少了46%。此外,在这种配置下,系统中68%的可溶性磷可用于通过结晶进行可能的磷回收过程(本研究未对此进行研究)。然而,在所得上清液中检测到较高的钙/磷摩尔比,这被指出是鸟粪石结晶效率的一个问题。

相似文献

1
Optimisation of sludge line management to enhance phosphorus recovery in WWTP.
Water Res. 2008 Nov;42(18):4609-18. doi: 10.1016/j.watres.2008.08.012. Epub 2008 Aug 20.
2
Phosphorus recovery by struvite crystallization in WWTPs: influence of the sludge treatment line operation.
Water Res. 2010 Apr;44(7):2371-9. doi: 10.1016/j.watres.2009.12.043. Epub 2010 Jan 7.
3
Sewage sludge management for phosphorus recovery as struvite in EBPR wastewater treatment plants.
Bioresour Technol. 2008 Jul;99(11):4817-24. doi: 10.1016/j.biortech.2007.09.054. Epub 2007 Oct 31.
4
Prevention of struvite scaling in digesters combined with phosphorus removal and recovery--the FIX-Phos process.
Water Environ Res. 2012 Mar;84(3):220-6. doi: 10.2175/106143012x13347678384125.
5
Solutions to a combined problem of excessive hydrogen sulfide in biogas and struvite scaling.
Water Sci Technol. 2006;53(6):203-10. doi: 10.2166/wst.2006.198.
8
Nutrient release, recovery and removal from waste sludge of a biological nutrient removal system.
Environ Technol. 2014 Nov-Dec;35(21-24):2734-42. doi: 10.1080/09593330.2014.920048. Epub 2014 May 27.
9
The determination of fertilizer quality of the formed struvite from effluent of a sewage sludge anaerobic digester.
J Hazard Mater. 2010 Sep 15;181(1-3):248-54. doi: 10.1016/j.jhazmat.2010.05.004. Epub 2010 May 11.

文献AI研究员

20分钟写一篇综述,助力文献阅读效率提升50倍。

立即体验

用中文搜PubMed

大模型驱动的PubMed中文搜索引擎

马上搜索

文档翻译

学术文献翻译模型,支持多种主流文档格式。

立即体验