Marchi A, Geerts S, Weemaes M, Schiettecatte W, Vanhoof C
Aquafin NV, Dijkstraat 8, B-2630 Aartselaar, Belgium E-mail:
VITO NV, Boeretang 200, B-2400 Mol, Belgium.
Water Sci Technol. 2015;71(4):487-94. doi: 10.2166/wst.2015.023.
To date, phosphorus recovery as struvite in wastewater treatment plants has been mainly implemented on water phases resulting from dewatering processes of the sludge line. However, it is possible to recover struvite directly from sludge phases. Besides minimising the return loads of phosphorus from the sludge line to the water line, placing such a process within the sludge line is claimed to offer advantages such as a higher recovery potential, enhanced dewaterability of the treated sludge, and reduced speed of scaling in pipes and dewatering devices. In the wastewater treatment plant at Leuven (Belgium), a full-scale struvite recovery process from digested sludge has been tested for 1 year. Several monitoring campaigns and experiments provided indications of the efficiency of the process for recovery. The load of phosphorus from the sludge line returning to the water line as centrate accounted for 15% of the P-load of the plant in the reference situation. Data indicated that the process divides this phosphorus load by two. An improved dewaterability of 1.5% of dry solids content was achieved, provided a proper tuning of the installation. Quality analyses showed that the formed struvite was quite pure.
迄今为止,污水处理厂中鸟粪石形式的磷回收主要应用于污泥处理流程脱水阶段产生的水相中。然而,也有可能直接从污泥相中回收鸟粪石。除了将污泥处理流程中磷的回流负荷降至最低外,在污泥处理流程中设置这样一个回收工艺还具有诸多优势,比如回收潜力更高、处理后污泥的脱水性能增强,以及管道和脱水设备的结垢速度降低。在比利时鲁汶的污水处理厂,已对从消化污泥中回收鸟粪石的全尺寸工艺进行了为期1年的测试。多次监测活动和实验证明了该回收工艺的效率。在参考情况下,从污泥处理流程回流至水相作为离心液的磷负荷占该厂磷负荷的15%。数据表明,该工艺可将此磷负荷减半。只要对设备进行适当调试,就能使干固体含量的脱水性能提高1.5%。质量分析表明,所形成的鸟粪石相当纯净。