Department of Nutrition, Center of Epidemiological Studies of Health and Nutrition (NESNUT), Faculty of Health Sciences, University of Brasília, Brasília 70910-900, Brazil.
Institute of Health, State Secretariat of São Paulo Health, São Paulo 01314-000, Brazil.
Int J Environ Res Public Health. 2022 Apr 20;19(9):5003. doi: 10.3390/ijerph19095003.
The Brazilian Breastfeeding and Complementary Feeding Strategy-Estratégia Amamenta e Alimenta Brasil (EAAB) aims to promote optimal breastfeeding (BF) and complementary feeding (CF) practices through the training of primary health professionals. Competition among health priorities and programs is one of the organizational contextual barriers to consolidating the implementation of the EAAB.
This case study included six Primary Health Units (PHU) certified in the EAAB. Documentary analysis, interviews, and surveys were conducted, which informed a conceptual logical model. Organizational context indicators (positive and negative) were identified across the logical model based on the Matus Triangle, and they were used to analyze the degree of implementation of the EAAB in the PHUs.
The logic model elucidated six stages of EAAB implementation, but none on post-certification monitoring. Ten indicators positively influenced the implementation, including having legislation that prioritizes BF and CF. Seven indicators exerted negative influence, especially the lack of specific funding resources for the EAAB. Only one PHU had a consolidated degree of implementation.
Lack of specific funding, monitoring of BF and CF practices, and compliance with certification criteria are the main challenges for the EAAB's sustainability.
巴西母乳喂养和补充喂养策略-Estratégia Amamenta e Alimenta Brasil (EAAB) 旨在通过培训初级卫生专业人员来促进最佳母乳喂养 (BF) 和补充喂养 (CF) 实践。卫生重点和项目之间的竞争是巩固 EAAB 实施的组织背景障碍之一。
本案例研究包括 6 个获得 EAAB 认证的初级卫生单位 (PHU)。进行了文献分析、访谈和调查,为概念逻辑模型提供了信息。根据 Matus 三角形,在逻辑模型中确定了组织背景指标(积极和消极),并使用这些指标来分析 PHU 中 EAAB 的实施程度。
逻辑模型阐明了 EAAB 实施的六个阶段,但没有一个是关于认证后的监测。有 10 个指标对实施产生了积极影响,包括具有优先考虑 BF 和 CF 的立法。有 7 个指标产生了负面影响,特别是缺乏 EAAB 的具体资金资源。只有一个 PHU 具有综合的实施程度。
缺乏具体资金、BF 和 CF 实践监测以及遵守认证标准是 EAAB 可持续性的主要挑战。