Marshall J F
Health Care Strateg Manage. 1988 Jan;6(1):10-2.
The management of major expansion projects often exceeds the in-house capabilities of hospitals. This article describes how Bakersfield Memorial Hospital in Bakersfield, California, used a construction management (CM) firm to handle its $40 million expansion project. The CM, as the owner's representative, ensured that the project was completed on schedule with changes from the original design made at minimal cost and with adequate documentation to provide legal protection for the hospital should cost disputes arise.
大型扩建项目的管理往往超出医院内部的能力范围。本文介绍了加利福尼亚州贝克斯菲尔德市的贝克斯菲尔德纪念医院如何利用一家施工管理(CM)公司来处理其4000万美元的扩建项目。作为业主代表的施工管理公司确保项目按时完成,对原设计的变更成本降至最低,并提供了充分的文件记录,以便在出现成本纠纷时为医院提供法律保护。