Suppr超能文献

[发电厂生态工业园区的能值评估]

[Emergy evaluation of power plant eco-industrial park].

作者信息

Wang Lingmei, Zhang Jintun

机构信息

Shanxi University, Taiyuan 030006, China.

出版信息

Ying Yong Sheng Tai Xue Bao. 2004 Jun;15(6):1047-50.

Abstract

In this paper, new emergy indices for the material circulation utilization and energy cascade utilization were presented to evaluate the emergy of power plant eco-industrial park. The common contribution of the members in power plant eco-industrial park should be accounted for emergy yield ratio (PEYR) and emergy investment ratio (PEIR), namely, PEYR = sigma(i = 1)6 (Fi + Ri + Ni)/sigma(i = 1)6 Fi and PEIR = sigma(i = 1)6 Fi/sigma(i = 1)6 (Ni + Ri). Saved renewable and nonrenewable resources and purchased resources and decreased environmental load should be accounted for environmental loading ratio (PELR) and index of sustainability (PESI), namely, PELR = sigma(i = 1)6 Fi/F' and PESI = PEYR/PELR. Case analysis on the Shuozhou power plant eco-industrial park showed that new emergy indices were practical in evaluating the power plant eco-industrial park.

摘要

本文提出了用于物质循环利用和能量梯级利用的新能值指标,以评估电厂生态工业园区的能值。电厂生态工业园区成员的共同贡献应通过能值产出率(PEYR)和能值投资率(PEIR)来衡量,即,PEYR = σ(i = 1)6 (Fi + Ri + Ni)/σ(i = 1)6 Fi 以及 PEIR = σ(i = 1)6 Fi/σ(i = 1)6 (Ni + Ri)。节省的可再生和不可再生资源、购买的资源以及降低的环境负荷应通过环境负载率(PELR)和可持续性指数(PESI)来衡量,即,PELR = σ(i = 1)6 Fi/F' 以及 PESI = PEYR/PELR。对朔州电厂生态工业园区的案例分析表明,新能值指标在评估电厂生态工业园区方面是实用的。

文献AI研究员

20分钟写一篇综述,助力文献阅读效率提升50倍。

立即体验

用中文搜PubMed

大模型驱动的PubMed中文搜索引擎

马上搜索

文档翻译

学术文献翻译模型,支持多种主流文档格式。

立即体验