Rehabilitation of El Yahoudia dumping site, Tunisia.

作者信息

Zaïri M, Ferchichi M, Ismaïl A, Jenayeh M, Hammami H

机构信息

Ecole Nationale d'Ingénieurs de Sfax, BP: W, 3038 Sfax, Tunisia.

出版信息

Waste Manag. 2004;24(10):1023-34. doi: 10.1016/j.wasman.2004.07.002.

Abstract

As in all developing countries, cities in Tunisia face serious problems of environmental pollution caused mainly by the inadequate and inefficient final disposal of their generated solid wastes. The Tunisian government launched a development program including the construction of landfills in the main cities and the closure of the contaminated sites issued from solid wastes landrising practice. The project of the Henchir El Yahoudia landfill restoration is the first experience in this programme. It has been suggested to convert the site to a green park and to implement an ornamental plant nursery. The whole surface of the landfill is approximately 100 ha from which 30 ha have been already transformed to an urban recreational area and the remaining 70 ha have to be characterized for the project extension. A field investigation by boring was conducted in order to define the geological and the hydrogeological conditions, the vertical and horizontal wastes layer extension, content and degree of decomposition and the composition and quantities of leachate and landfill gas. Representative samples of waste, soil, groundwater and leachate were collected for laboratory analyses. Several of these borings were converted to piezometers to define the flow regime in the site. The results showed that the biogas (CH4, H2S, and CO2), leachate and waste, distribution in the site is mainly affected by the temporal variation of the site operating method. The underlying fissured clay layer facilitated leachate infiltration into the groundwater where high BOD, COD and nitrogen concentrations were registered.

摘要

与所有发展中国家一样,突尼斯的城市面临着严重的环境污染问题,主要原因是其产生的固体废物最终处置不当且效率低下。突尼斯政府启动了一项发展计划,包括在主要城市建设垃圾填埋场,以及关闭因固体废物填埋作业而产生的受污染场地。Henchir El Yahoudia垃圾填埋场修复项目是该计划中的首次尝试。有人建议将该场地改造成一个绿色公园,并建立一个观赏植物苗圃。垃圾填埋场的总面积约为100公顷,其中30公顷已改造成城市休闲区,其余70公顷有待确定用于项目扩展。通过钻探进行了现场调查,以确定地质和水文地质条件、垂直和水平废物层的延伸范围、分解程度以及渗滤液和填埋气的成分和数量。采集了废物、土壤、地下水和渗滤液的代表性样本进行实验室分析。其中几个钻孔被改造成测压计,以确定场地内的水流状态。结果表明,场地内沼气(CH4、H2S和CO2)、渗滤液和废物的分布主要受场地运营方式的时间变化影响。下面的裂隙粘土层促进了渗滤液渗入地下水中,在那里记录到了高BOD、COD和氮浓度。

文献检索

告别复杂PubMed语法,用中文像聊天一样搜索,搜遍4000万医学文献。AI智能推荐,让科研检索更轻松。

立即免费搜索

文件翻译

保留排版,准确专业,支持PDF/Word/PPT等文件格式,支持 12+语言互译。

免费翻译文档

深度研究

AI帮你快速写综述,25分钟生成高质量综述,智能提取关键信息,辅助科研写作。

立即免费体验