Dixon Sherry L, McLaine Pat, Kawecki Carolyn, Maxfield Robert, Duran Sandra, Hynes Pat, Plant Thomas
National Center for Healthy Housing, Columbia, MD 21044, USA.
Environ Res. 2006 Sep;102(1):113-24. doi: 10.1016/j.envres.2006.01.006. Epub 2006 Feb 28.
The Boston lead safe yards low cost lead in soil treatment, demonstration, and evaluation was developed to explore the viability and effectiveness of low-cost soil interventions to reduce exposure to soil lead hazards. Buildings that had been abated for lead to Massachusetts's deleading standards in the previous 5 yrs and met other program requirements were recruited for the evaluation. Following individual property assessments, yards were treated with application of ground coverings and ground barriers in 2000-2001 and followed up at 1 yr. The treatment cost ranged from 1095 dollars to 5643 dollars with an average of 2798 dollars. Soil lead levels at the building dripline, measured with a field-portable X-ray fluorescence analyzer (Niton Model 702 Spectrum Analyzer), dropped from 2021 PPM at baseline to 206 PPM at 1-yr follow-up. Most of the barrier treatments continued to block access to the lead-contaminated soil at 1yr. At the follow-up, few properties with grass treatment had areas that were completely bare, but 28% had more than a small amount of treated areas bare. Treatments were effective in reducing entryway dust lead in the rear of the building if the residents reported they had maintained the yard treatments. Each additional yard work activity reported was predicted to lower 1-yr floor dust lead loading at the rear common/main and dwelling unit entries by about 20%. Each additional 100 ft2 of yard treated was predicted to lower 1-yr floor dust loading at the rear dwelling unit entry by 19%. Treatments did not show a dust lead effect at 1 yr in the front entryway of the building, but the investigators believe that this may be due to the effect of resident cleaning overshadowing the treatment effect.
波士顿铅安全庭院低成本土壤铅处理、示范及评估项目旨在探索低成本土壤干预措施在降低土壤铅危害暴露方面的可行性和有效性。招募了过去5年内已按照马萨诸塞州铅清除标准进行铅清除且符合其他项目要求的建筑物参与评估。在进行个体房产评估后,于2000 - 2001年对庭院进行了地被覆盖物和地面屏障的应用处理,并在1年后进行随访。处理成本从1095美元到5643美元不等,平均为2798美元。使用现场便携式X射线荧光分析仪(尼通702光谱分析仪)测量建筑物滴水线处的土壤铅含量,从基线时的2021 ppm降至1年随访时的206 ppm。大多数屏障处理在1年后仍能阻止进入受铅污染的土壤。在随访时,很少有进行草地处理的房产有完全裸露的区域,但28%有超过少量的处理区域裸露。如果居民报告他们维持了庭院处理,这些处理措施在减少建筑物后部入口处灰尘铅含量方面是有效的。据预测,每多报告一项庭院工作活动,建筑物后部公共/主要入口和居住单元入口处1年的地板灰尘铅负荷将降低约20%。据预测,每多处理100平方英尺的庭院,居住单元后部入口处1年的地板灰尘负荷将降低19%。处理措施在建筑物前部入口处1年时未显示出灰尘铅含量降低的效果,但研究人员认为这可能是由于居民清洁的影响掩盖了处理效果。