Huang Yi-Xin, Jiang Tao, Hang De-Rong, Wang Zhi-Jian, Li Wei, Zhu Tao, Chao Nong, Wang Yue-Jin, Zhang Lian-Heng, Zhang Xiao-Zhong
Jiangsu Institute of Schistosomiasis, Wuxi 214064, China.
Zhongguo Xue Xi Chong Bing Fang Zhi Za Zhi. 2011 Jun;23(3):311-3.
To evaluate the effectiveness of blocking diffusion of Oncomelania snails with the blocking network via collecting water from middle layer.
According to the principle of the installation preventing snails via collecting water from middle layer without snails, the blocking network was manufactured. The field test of the blocking diffusion of snails with the blocking network was carried out in the electric pumping station and the irrigation located in the area with snails. The snails stained were put into the water inlet of the pump when the pump was actuating, and the snails pumped were observed during the test period. The cost of the test was also calculated.
The rate of blocking diffusion of snails with the blocking network was 100%, and the direct costs were only 11 030 CNY.
The blocking network via collecting water from middle layer has good effect for prevention of snail dispersal. It is simple for manutacturing and installation, and suitable for emergency blocking diffusion of snails in the east route of South-to-North Water Diversion Project and the electric pumping station with snails.
通过中层取水阻断钉螺扩散,评估阻断网的效果。
依据中层取水无螺防螺装置原理制作阻断网。在有螺地区的电灌站进行阻断网阻断钉螺扩散的现场试验。水泵启动时,将染色钉螺放入水泵进水口,试验期间观察被泵出的钉螺情况,并计算试验成本。
阻断网阻断钉螺扩散率为100%,直接成本仅11030元。
中层取水阻断网对预防钉螺扩散效果良好。其制作与安装简便,适用于南水北调东线工程及有螺电灌站钉螺的应急阻断扩散。