Desroches A
École centrale Paris, Grande-Voie-des-Vignes, 92295 Châtenay-Malabry cedex, France.
Transfus Clin Biol. 2013 May;20(2):198-210. doi: 10.1016/j.tracli.2013.02.002. Epub 2013 Apr 17.
After a reminder on the fundamental concepts of the management of risk, the author describes the overall analysis of risk (AGR), name given by the author to the up-to-date APR method which after several changes of the initial process aims to cover a perimeter of analysis and broader management both at the level of structural that business risks of any kind throughout the system development life cycle, of the study of its feasibility to dismantling.