Kadar Michael
J Bus Contin Emer Plan. 2014;8(3):238-51.
This paper will present the building blocks for developing and implementing the BCM risk index; whether it is used as a comprehensive metric for risk or preparedness. This paper introduces the concept of a business continuity management (BCM) risk index--a comprehensive metric that measures and reports the status of the primary 'intended outcome' of the BCM programme to top management. In addition to measuring the primary programme output,;the BCM risk index can be used to demonstrate the overall value of the BCM programme to executive management. This is accomplished because the BCM risk index allows quantitative measurement of current risk levels and their comparison with established risk tolerances. The BCM Risk Index can provide executive management with reports on the risk level of individual business units, departments, subsidiaries or the enterprise in a way that drives both risk management and BCM initiatives. The name 'risk index' can be misleading, however. The BCM risk index concept can also be used to measure preparedness levels. In fact, implementation at DTE Energy has resulted in calling it the 'preparedness index', which is used to measure and report preparedness levels rather than risk levels.
本文将介绍开发和实施业务连续性管理(BCM)风险指数的基础要素;无论它是用作风险的综合指标还是准备情况的指标。本文引入了业务连续性管理(BCM)风险指数的概念——一种向高层管理人员衡量和报告BCM计划主要“预期成果”状态的综合指标。除了衡量主要计划产出外,BCM风险指数还可用于向管理层展示BCM计划的整体价值。之所以能做到这一点,是因为BCM风险指数允许对当前风险水平进行定量测量,并将其与既定的风险容忍度进行比较。BCM风险指数可以向管理层提供关于各个业务部门、部门、子公司或企业风险水平的报告,从而推动风险管理和BCM计划的实施。然而,“风险指数”这个名称可能会产生误导。BCM风险指数概念也可用于衡量准备情况水平。事实上,底特律爱迪生公司(DTE Energy)在实施过程中已将其称为“准备情况指数”,该指数用于衡量和报告准备情况水平而非风险水平。