Schunke B, Boilson D, Chareyre J, Choi C-H, Decamps H, El-Ouazzani A, Geli F, Graceffa J, Hemsworth R, Kushwah M, Roux K, Shah D, Singh M, Svensson L, Urbani M
ITER Organization, Route de Vinon-sur-Verdon, 13115 St Paul lez Durance, France.
Rev Sci Instrum. 2016 Feb;87(2):02C101. doi: 10.1063/1.4931802.
The ITER baseline foresees 2 Heating Neutral Beams (HNB's) based on 1 MeV 40 A D(-) negative ion accelerators, each capable of delivering 16.7 MW of deuterium atoms to the DT plasma, with an optional 3rd HNB injector foreseen as a possible upgrade. In addition, a dedicated diagnostic neutral beam will be injecting ≈22 A of H(0) at 100 keV as the probe beam for charge exchange recombination spectroscopy. The integration of the injectors into the ITER plant is nearly finished necessitating only refinements. A large number of components have passed the final design stage, manufacturing has started, and the essential test beds-for the prototype route chosen-will soon be ready to start.
国际热核聚变实验堆(ITER)基线方案预计采用两台基于1兆电子伏特、40安培D(-)负离子加速器的加热中性束(HNB),每台能够向氘氚(DT)等离子体输送16.7兆瓦的氘原子,还预计有一台可选的第三台HNB注入器作为可能的升级选项。此外,一台专用诊断中性束将以100千电子伏特注入约22安培的H(0),作为电荷交换复合光谱学的探测束。注入器与ITER装置的集成工作已接近尾声,只需进行优化。大量部件已通过最终设计阶段,制造工作已经开始,并且——对于所选的原型路线而言——关键试验台很快将准备好投入使用。