Mei Yu, Cheng Zhuo-wei, Wang Jia-de, Lu Yin
Huan Jing Ke Xue. 2015 Dec;36(12):4389-95.
A pilot biotrickling filter (BTF) was set up for removal of a mixed waste gas containing toluene and ethanol. The packing material was composed of polyhedral sphere and polyhedral hollow column previously designed by our group. The results showed this BTF could successfully start up within only 8 d and the average eliminate capacities for toluene and ethanol were 97.14 and 113.10 g · (m³ · h)⁻¹, respectively. Empty bed residence time (EBRT) and the inlet concentration had effects on the removal of toluene. The maximum elimination capacity of toluene and ethanol was 123.34 and 206.36 g (m³ · h)⁻¹ under EBRT of 21.11 s, respectively. However, the effect of spray liquid density was not obvious, and the optimal value of solution and gas ratio was 6.82 L · m⁻³. The influence of unstable processing condition on its performance was also investigated. NaOH solution could effectively reduce the plugging of the filler layer, and the removal capability of pollutant could be recovered within 3 days. After the running was stopped for 10 d, the removal performance of this BTF could be quickly recovered.
搭建了一个中试规模的生物滴滤塔(BTF),用于去除含有甲苯和乙醇的混合废气。填料由本课题组先前设计的多面体球和多面体空心柱组成。结果表明,该生物滴滤塔仅需8天即可成功启动,甲苯和乙醇的平均去除能力分别为97.14和113.10 g·(m³·h)⁻¹。空床停留时间(EBRT)和进气浓度对甲苯的去除有影响。在空床停留时间为21.11 s时,甲苯和乙醇的最大去除能力分别为123.34和206.36 g·(m³·h)⁻¹。然而,喷淋液密度的影响不明显,液气比的最佳值为6.82 L·m⁻³。还研究了不稳定运行条件对其性能的影响。NaOH溶液可有效减少填料层的堵塞,且污染物去除能力可在3天内恢复。在停止运行10天后,该生物滴滤塔的去除性能可迅速恢复。