Lu Qi, Narsilio Guillermo A, Aditya Gregorius Riyan, Johnston Ian W
Department of Infrastructure Engineering, The University of Melbourne, Australia.
Data Brief. 2017 Mar 18;12:9-12. doi: 10.1016/j.dib.2017.03.028. eCollection 2017 Jun.
The data reported in this article presents actual installation costs and performance data for a selection of residential Ground Source Heat Pump (GSHP) systems in Melbourne, Australia. The installation cost data includes five main cost components: ground loop installation, head pipe installation, heat pump, mechanical room installation, and fittings. The performance data presented here includes timestamp, air temperature and thermal loading. A more comprehensive analysis of this data may be obtained from the article entitled "Economic analysis of vertical ground source heat pump systems in Melbourne" (Q. Lu, G.A. Narsilio, G.R. Aditya, I.W. Johnston, 2017) [1].
本文所报告的数据展示了澳大利亚墨尔本一系列住宅地源热泵(GSHP)系统的实际安装成本和性能数据。安装成本数据包括五个主要成本组成部分:地埋管安装、主管安装、热泵、机房安装和配件。这里呈现的性能数据包括时间戳、空气温度和热负荷。对这些数据更全面的分析可从题为《墨尔本垂直地源热泵系统的经济分析》(Q. 卢、G.A. 纳西利奥、G.R. 阿迪蒂亚、I.W. 约翰斯顿,2017年)[1]的文章中获取。