Yang Qinghe, Li Gang, Li Weifeng, Cai Tian, Liu Hang, Zhao Yiming, Zhang Yabing
College of Mining, Liaoning Technical University, Fuxin, 123000, China.
Sci Rep. 2023 Sep 27;13(1):16178. doi: 10.1038/s41598-023-43483-2.
Because of the deficiencies in safety and economy of the single hydraulic prop passive advanced support, the grouting anchor cable active advanced support technology is proposed with the Changping Coal Mine 53,081 roadway as the engineering background. By using a combination of theoretical analysis, laboratory tests, numerical simulation, and field tests, the influence of different grouting parameters on the diffusion law of grout is studied. Considering the effect of the stress field on grout migration, a grout seepage-stress coupling model is established. Grouting material ratio tests are carried out and grout parameters are tested. The grouting part of the advanced grouting anchor cable is modeled and solved using the COMSOL Multiphysics numerical software. The results show that the grouting material selected is Portland cement 42.5 and water glass double liquid grout, with a slurry ratio of 15% ACZ-1 type additive and 4% water glass content, and a water-cement ratio of 0.6. The grouting pressure for the 53,081 roadway grouting anchor cable advanced support is 5 MPa, the grouting time is 6 min, and the grouting anchor cable spacing is 2000 mm × 1000 mm. The engineering application shows that the maximum roof subsidence is 180 mm, the maximum separation value at a depth of 9 m is 24 mm, and the maximum separation value at a depth of 3 m is 90 mm. The research results have achieved effective advanced support for the 53,081 roadway, replacing the single hydraulic prop, and provided a theoretical basis for the subsequent design of advanced support parameters for mining roadways.
针对单体液压支柱被动超前支护在安全性和经济性方面存在的不足,以长平煤矿53081巷道为工程背景,提出了注浆锚索主动超前支护技术。通过理论分析、室内试验、数值模拟和现场试验相结合的方法,研究了不同注浆参数对浆液扩散规律的影响。考虑应力场对浆液运移的作用,建立了浆液渗流 - 应力耦合模型。进行了注浆材料配比试验并测试了浆液参数。利用COMSOL Multiphysics数值软件对超前注浆锚索的注浆部分进行建模求解。结果表明,选用的注浆材料为42.5普通硅酸盐水泥与水玻璃双液浆,浆液配比为15%的ACZ - 1型添加剂、4%的水玻璃含量,水灰比为0.6。53081巷道注浆锚索超前支护的注浆压力为5MPa,注浆时间为6min,注浆锚索间距为2000mm×1000mm。工程应用表明,顶板最大下沉量为180mm,9m深处最大离层值为24mm,3m深处最大离层值为90mm。研究成果实现了对53081巷道的有效超前支护,取代了单体液压支柱,为后续采区巷道超前支护参数设计提供了理论依据。