Aftab Usman, Jaleel Farrokh, Aslam Mughees, Khan Tipu Javed Ahmed
International Islamic University Islamabad (IIUI), Department of Mechanical Engineering/ Engineering Management, Pakistan.
NUST Balochistan Campus, National University of Science and Technology (NUST), Quetta, Balochistan, Pakistan.
PLoS One. 2025 May 28;20(5):e0323841. doi: 10.1371/journal.pone.0323841. eCollection 2025.
Highway construction projects are known for their propensity to consume enormous quantities of materials and their susceptibility to generate considerable waste. Adequate research has been conducted on identifying the causes of waste produced in building projects, however, there are limited studies available on identifying causative factors for highway projects. This study aims to identify and evaluate the causes and factors of waste generated on highway projects using a literature review and questionnaire survey technique. Causes leading to waste in highway projects were identified from the literature as well as from highway construction experts. Subsequently, quantitative data were collected from 127 highway construction professionals using a Likert Scale questionnaire survey, which was ranked using the Relative Importance Index (RII) and further analyzed by using a very robust Factor Analysis (FA) technique. RII results highlight the most significant causes of waste in highway construction, while FA suggests the main factors contributing to the waste in highway projects. The top five most significant causes of waste revealed by this study were: (1) mistakes of surveyors, (2) faulty drawings, (3) incompetence of quantity surveyors, (4) faulty/substandard work, and (5) poor workers' skills, whereas the seven waste factor groups evaluated by the study were: (1) design, (2) storage, (3) survey, (4) workers, (5) waste management, (6) site management, and (7) external. This study further suggested waste management and mitigation strategies for highway construction projects corresponding to each factor group. This is a novel study on waste generation in highway projects in Pakistan and will assist academia and industry practitioners in understanding and controlling construction waste generation in highway projects during various stages of project execution.
公路建设项目以其消耗大量材料的倾向以及产生大量废弃物的易发性而闻名。关于确定建筑项目中产生废弃物的原因,已经进行了充分的研究,然而,关于确定公路项目的成因因素的研究却很有限。本研究旨在通过文献综述和问卷调查技术,识别和评估公路项目中产生废弃物的原因和因素。从文献以及公路建设专家那里确定了导致公路项目废弃物产生的原因。随后,使用李克特量表问卷调查从127名公路建设专业人员那里收集了定量数据,该问卷使用相对重要性指数(RII)进行排名,并通过非常强大的因子分析(FA)技术进一步分析。RII结果突出了公路建设中废弃物产生的最重要原因,而FA则表明了导致公路项目废弃物产生的主要因素。本研究揭示的废弃物产生的前五大最重要原因是:(1)测量员的失误,(2)图纸错误,(3)工料测量师能力不足,(4)工作有缺陷/不合格,(5)工人技能差,而该研究评估的七个废弃物因素组是:(1)设计,(2)储存,(3)测量,(4)工人,(5)废弃物管理,(6)现场管理,(7)外部因素。本研究还针对每个因素组提出了公路建设项目的废弃物管理和缓解策略。这是一项关于巴基斯坦公路项目废弃物产生的新颖研究,将有助于学术界和行业从业者在项目执行的各个阶段理解和控制公路项目中的建筑废弃物产生。