Basler T G, Mims D H, Smoot S J
Bull Med Libr Assoc. 1983 Oct;71(4):386-90.
Planning the addition to an existing health sciences library building involved problems not normally encountered in planning a totally new structure. Some of the problems in combining the old and new buildings of the Medical College of Georgia Library and their resolution are discussed in this paper. Emphasized in particular is the relationship between institutional goals, library goals, and the library building.
对现有健康科学图书馆建筑进行扩建规划所涉及的问题,与规划全新建筑时通常遇到的问题有所不同。本文讨论了佐治亚医学院图书馆新旧建筑合并过程中的一些问题及其解决方案。特别强调了机构目标、图书馆目标与图书馆建筑之间的关系。