Irons M J, Clermont Y
Am J Anat. 1982 Oct;165(2):121-30. doi: 10.1002/aja.1001650204.
The morphogenesis of the fibrous sheath in the rat spermatid has been studied by electron microscopy and by EM radioautogaphy following injection of 3H-proline. The appearance of the developing fibrous sheath from the distal to proximal end of the principal piece has been examined in spermatids in each of the 19 steps of spermiogenesis. The precise timing of the various steps of its formation has been established and related to radioautographic observations on the synthesis and incorporation of proteins into the developing fibrous sheath. The longitudinal columns form slowly over a period of 15 days, appearing first at the distal end of the principal piece in step 2 and gradually extending in a proximal direction, ending at the level of the annulus in step 17. Throughout this 15-day period, proline-containing proteins are synthesized and incorporated into the growing columns. All of the ribs, on the other hand, arise from anlagen which are assembled along the length of the principal piece during a much shorter (4.5-day) period between steps 11 and 15 of spermiogenesis. New rib anlagen seemingly originate from bundles of proteinaceous filamentous material which are synthesized in the cytoplasm of step 11-15 spermatids and become aligned along the plasma membrane of the principal piece, starting at the distal end. These observations suggest that the two components of the fibrous sheath are assembled by means of two independent mechanisms that proceed asynchronously except during an overlap period of 2.5 days between steps 12 and 14.
通过电子显微镜以及注射³H-脯氨酸后的电子显微镜放射自显影技术,对大鼠精子细胞中纤维鞘的形态发生进行了研究。在精子发生的19个步骤中的每一步,都对精子细胞中从主段远端到近端发育的纤维鞘的外观进行了检查。已经确定了其形成各个步骤的精确时间,并将其与关于蛋白质合成以及将蛋白质掺入发育中的纤维鞘的放射自显影观察结果相关联。纵向柱在15天的时间内缓慢形成,首先在步骤2中出现在主段的远端,并逐渐向近端延伸,在步骤17中在环的水平处结束。在这15天的整个期间,含脯氨酸的蛋白质被合成并掺入正在生长的柱中。另一方面,所有的肋条都起源于原基,这些原基在精子发生的步骤11和15之间的更短(4.5天)期间沿着主段的长度组装。新的肋条原基似乎起源于蛋白质丝状物质束,这些物质在步骤11 - 15精子细胞的细胞质中合成,并从远端开始沿着主段的质膜排列。这些观察结果表明,纤维鞘的两个组成部分是通过两种独立的机制组装的,这两种机制除了在步骤12和14之间有2.5天的重叠期外是异步进行的。