Binello A, Mannan S, Ruddock K H
Physics Department, Imperial College of Science, Technology and Medicine, London, UK.
Spat Vis. 1995;9(3):343-62. doi: 10.1163/156856895x00043.
Saccadic eye movements during visual search made to detect a target embedded in a set of randomly distributed, identical elements have been measured. Both the time T1/2 taken to press a button to denote target detection (the manual response time) and the time Tf taken to fixate the target were determined. It is established that these two response times are closely related to each other, and have similar dependence on the number of reference elements N, both in search tasks for which T1/2 is independent of N (parallel search) and in those for which T1/2 is proportional to N (serial search). The properties of the eye movements made by two subjects in response to a variety of stimuli have been subjected to detailed analysis. It is shown that the number of fixations made during a given search is proportional to the manual response time T1/2 and that the probability of locating the target with a single fixation falls steeply as T1/2 increases. The latency of the first saccade is approximately linearly dependent on T1/2, and latencies made in performing a given task are distributed in a Gaussian manner the spread of the latency values increasing as the mean latency increases. It is conclude that the measurement of eye movements provides a more detailed description of visual search than that given by measurement of manual response times, and that in terms of eye movements, only a subset of those tasks for which T1/2 is independent of N can be classified as parallel.
已测量了在视觉搜索过程中的扫视眼动,该搜索旨在检测嵌入在一组随机分布的相同元素中的目标。确定了按下按钮表示目标检测的时间T1/2(手动响应时间)和注视目标的时间Tf。已确定这两个响应时间彼此密切相关,并且在T1/2与N无关的搜索任务(并行搜索)和T1/2与N成比例的搜索任务(串行搜索)中,它们对参考元素数量N具有相似的依赖性。对两名受试者对各种刺激做出反应时的眼动特性进行了详细分析。结果表明,在给定搜索过程中进行的注视次数与手动响应时间T1/2成正比,并且随着T1/2增加,单次注视定位目标的概率急剧下降。首次扫视的潜伏期大致线性依赖于T1/2,并且在执行给定任务时的潜伏期以高斯方式分布,潜伏期值的分散随着平均潜伏期的增加而增加。得出的结论是,与手动响应时间的测量相比,眼动测量提供了对视觉搜索更详细的描述,并且就眼动而言,只有T1/2与N无关的那些任务的一个子集可以归类为并行任务。