Hanna L A
Columbia Largo Medical Center, Florida, USA.
Nurs Manage. 1997 Jul;28(7):32D.
A multidisciplinary team initiated a plan of action to manage a consistently frustrating situation--telemetry utilization. Measurable criteria determined who needed telemetry and the length of time a patient would be monitored.
一个多学科团队启动了一项行动计划,以应对一个一直令人沮丧的情况——遥测技术的使用。可衡量的标准确定了谁需要遥测以及患者将被监测的时间长度。