Hargrove M, Ramish B C, O'Donnell A, Aherne T
Cardiothoracic Surgery Unit, Cork University Hospital, Wilton, Ireland.
Perfusion. 2002 Sep;17(5):369-72. doi: 10.1191/0267659102pf592oa.
The incidence of electrical failure during cardiopulmonary bypass (CPB) has been reported to occur in approximately 1 per 1000 cases. While the resultant morbidity and mortality is low, electrical failure is a life-threatening scenario. We report three major electrical failures during CPB in a patient population of 3500 over a 15-year period. These cases involved mains failure and generator shut down, mains failure and generator power surge, and failure of the uninterruptable power supply (UPS), which caused protected sockets to shut down. Protocols for preventative maintenance, necessary equipment, battery backup and guidelines for the successful management of such accidents during CPB are discussed.
据报道,体外循环(CPB)期间电气故障的发生率约为每1000例中出现1例。虽然由此导致的发病率和死亡率较低,但电气故障是一种危及生命的情况。我们报告了在15年期间3500例患者中发生的3起CPB期间的重大电气故障。这些案例包括市电故障和发电机停机、市电故障和发电机电源浪涌,以及不间断电源(UPS)故障,后者导致受保护插座关闭。本文讨论了预防性维护协议、必要设备、备用电池以及CPB期间此类事故成功管理的指南。