Hanhan O, Artan N, Orhon D
Mercedes-Benz Türk AS. Quality Management Department, Hoşdere Köyü Mevkii Sirat Deresi Hadimköy-Istanbul, Turkey.
Water Sci Technol. 2002;46(8):75-82.
The paper provides the basis and the conceptual approach of applying process kinetics and modelling to the design of alternating activated sludge systems for retrofitting existing activated sludge plants to intermittent aeration for nitrogen removal. It shows the significant role of the two specific parameters, namely, the aerated fraction and the cycle time ratio on process performance through model simulations and proposes a way to incorporate them into a design procedure using process stoichiometry and mass balance. It illustrates the effect of these parameters, together with the sludge age, in establishing the balance between the denitrification potential and the available nitrogen created in the anoxic/aerobic sequences of system operation.
本文提供了将过程动力学和建模应用于交替活性污泥系统设计的基础和概念方法,该系统用于对现有活性污泥厂进行改造,使其采用间歇曝气进行脱氮。通过模型模拟,本文展示了两个特定参数,即曝气分数和周期时间比,对工艺性能的重要作用,并提出了一种利用过程化学计量学和质量平衡将它们纳入设计程序的方法。本文阐述了这些参数与污泥龄一起,在系统运行的缺氧/好氧序列中建立反硝化潜力与可利用氮之间平衡的作用。