Suppr超能文献

BSM1配置下ASM/Takács模型的模拟分析

Simulation analysis of ASM/Takács models in the BSM1 configuration.

作者信息

Sorour M T, Bahgat L M F

机构信息

Sanitary Engineering Department, Faculty of Engineering, Alexandria University, 21544 Alexandria, Egypt.

出版信息

Environ Technol. 2006 Oct;27(10):1163-70. doi: 10.1080/09593332708618730.

Abstract

The present paper summarizes the outlines of a simulation analysis study conducted on the BSM1 (formerly the COST benchmark) configuration using activated sludge models (ASM1, ASM2d and ASM3) coupled to Takács settler model. The prime objective was to develop reliable simulation software programs to implement these complex models according to the working conditions of a realistic plant. The analysis focused on comparing the steady state predictions of models ASM1/ ASM3 when imposed to pulse/ step type disturbances on wastewater characteristics and control variables, then on assessing the capability of the simulated configuration for bio-P removal using model ASM2d. Section 1 of the paper briefly presents problem definition/ solution approach while section 2 demonstrates some examples showing the main indications of the simulation analysis. ASM1/ ASM3 predictions indicate the presence of some significant differences between both models that could be related to their underlying concepts. ASM2d simulations show that adverse effects on the permissible limit of effluent's ammonia concentration should be expected when the plant is operated to achieve dual nutrient removal.

摘要

本文总结了一项模拟分析研究的要点,该研究使用与塔卡奇沉降器模型耦合的活性污泥模型(ASM1、ASM2d和ASM3)对BSM1(以前的COST基准)配置进行了模拟分析。主要目标是根据实际工厂的工况开发可靠的模拟软件程序,以实现这些复杂模型。分析重点在于比较当对废水特性和控制变量施加脉冲/阶跃型干扰时,ASM1/ASM3模型的稳态预测,然后使用ASM2d模型评估模拟配置的生物除磷能力。本文第1节简要介绍了问题定义/解决方法,而第2节展示了一些示例,说明了模拟分析的主要结果。ASM1/ASM3的预测表明,这两个模型之间存在一些显著差异,这可能与它们的基本概念有关。ASM2d模拟表明,当工厂运行以实现双营养物去除时,应预期对出水氨浓度的允许限值会产生不利影响。

文献AI研究员

20分钟写一篇综述,助力文献阅读效率提升50倍。

立即体验

用中文搜PubMed

大模型驱动的PubMed中文搜索引擎

马上搜索

文档翻译

学术文献翻译模型,支持多种主流文档格式。

立即体验