Grau P, Vanrolleghem P, Ayesa E
Section of Environmental Engineering CEIT and Tecnun (University of Navarra), PO Box 1555, San Sebastián, Spain.
Water Sci Technol. 2007;56(8):57-65. doi: 10.2166/wst.2007.602.
In this paper, a new methodology for integrated modelling of the WWTP has been used for the construction of the Benchmark Simulation Model N degrees 2 (BSM2). The transformations-approach proposed in this methodology does not require the development of specific transformers to interface unit process models and allows the construction of tailored models for a particular WWTP guaranteeing the mass and charge continuity for the whole model. The BSM2 PWM constructed as case study, is evaluated by means of simulations under different scenarios and its validity in reproducing water and sludge lines in WWTP is demonstrated. Furthermore the advantages that this methodology presents compared to other approaches for integrated modelling are verified in terms of flexibility and coherence.
在本文中,一种用于污水处理厂综合建模的新方法已被用于构建基准模拟模型第2版(BSM2)。该方法中提出的变换方法不需要开发特定的变压器来连接单元过程模型,并且允许为特定的污水处理厂构建定制模型,确保整个模型的质量和电荷连续性。作为案例研究构建的BSM2 PWM,通过在不同场景下的模拟进行评估,并证明了其在再现污水处理厂水和污泥流程方面的有效性。此外,该方法与其他综合建模方法相比所具有的优势在灵活性和连贯性方面得到了验证。