Department of Civil Engineering, University of Ottawa, Ottawa, ON, Canada K1N 6N5.
Bioresour Technol. 2011 Jan;102(2):1079-86. doi: 10.1016/j.biortech.2010.08.061. Epub 2010 Aug 24.
Anaerobic digestion of whole stillage from a dry-grind corn-based ethanol plant was evaluated by batch and continuous-flow digesters under thermophilic and mesophilic conditions. At whole corn stillage concentrations of 6348 to 50,786 mg total chemical oxygen demand (TCOD)/L, at standard temperature (0 °C) and pressure (1 atm), preliminary biochemical methane potential assays produced 88±8 L (49±5 L CH4) and 96±19 L (65±14 L CH4) biogas per L stillage from mesophilic and thermophilic digesters, respectively. Continuous-flow studies for the full-strength stillage (TCOD=254 g/L) at organic loadings of 4.25, 6.30 and 9.05 g TCOD/L days indicated unstable performance for the thermophilic digester. Among the sludge retention times (SRTs) of 60, 45 and 30 days tested, the mesophilic digestion was successful only at 60 days-SRT which does not represent a practical operation time for a large scale bioethanol plant. Future laboratory studies will focus on different reactor configurations to reduce the SRT needed in the digesters.
采用批式和连续流消化器,在嗜热和中温条件下对干磨玉米乙醇厂全酒糟进行了厌氧消化评估。在全玉米酒糟浓度为 6348 至 50786mg 总化学需氧量(TCOD)/L、标准温度(0°C)和压力(1 大气压)下,初步生化甲烷潜能测定分别产生了 88±8L(49±5L CH4)和 96±19L(65±14L CH4)沼气/L 中温和嗜热消化器中的酒糟。在有机负荷为 4.25、6.30 和 9.05g TCOD/L·天的全强度酒糟(TCOD=254g/L)的连续流动研究表明,嗜热消化器的性能不稳定。在所测试的 60、45 和 30 天的污泥停留时间(SRT)中,仅在 60 天 SRT 下中温消化成功,这对于大型生物乙醇厂来说并不是实际的运行时间。未来的实验室研究将集中于不同的反应器构型,以减少消化器所需的 SRT。