USDA-ARS, University Park, PA 16802, USA.
J Environ Qual. 2012 May-Jun;41(3):664-71. doi: 10.2134/jeq2011.0294.
High levels of accumulated phosphorus (P) in soils of the Delmarva Peninsula are a major source of dissolved P entering drainage ditches that empty into the Chesapeake Bay. The objective of this study was to design, construct, and monitor a within-ditch filter to remove dissolved P, thereby protecting receiving waters against P losses from upstream areas. In April 2007, 110 Mg of flue gas desulfurization (FGD) gypsum, a low-cost coal combustion product, was used as the reactive ingredient in a ditch filter. The ditch filter was monitored from 2007 to 2010, during which time 29 storm-induced flow events were characterized. For storm-induced flow, the event mean concentration efficiency for total dissolved P (TDP) removal for water passing through the gypsum bed was 73 ± 27% confidence interval (α = 0.05). The removal efficiency for storm-induced flow by the summation of load method was 65 ± 27% confidence interval (α = 0.05). Although chemically effective, the maximum observed hydraulic conductivity of FGD gypsum was 4 L s(-1), but it decreased over time to <1 L s(-1). When bypass flow and base flow were taken into consideration, the ditch filter removed approximately 22% of the TDP load over the 3.6-yr monitoring period. Due to maintenance and clean-out requirements, we conclude that ditch filtration using FGD gypsum is not practical at a farm scale. However, we propose an alternate design consisting of FGD gypsum-filled trenches parallel to the ditch to intercept and treat groundwater before it enters the ditch.
特拉华-马里兰半岛土壤中积累的高浓度磷(P)是进入排入切萨皮克湾的排水渠的溶解磷的主要来源。本研究的目的是设计、建造和监测沟渠内的过滤器以去除溶解的 P,从而保护受纳水体免受上游地区的 P 损失。2007 年 4 月,使用 110 Mg 烟气脱硫(FGD)石膏作为反应成分,FGD 石膏是一种低成本的煤燃烧产物,用于沟渠内的过滤器。从 2007 年到 2010 年监测了沟渠过滤器,在此期间对 29 次风暴诱发的水流事件进行了特征描述。对于风暴诱发的水流,通过石膏床的总溶解磷(TDP)去除的事件平均浓度效率为 73±27%置信区间(α=0.05)。通过负荷法总和计算的风暴诱导水流的去除效率为 65±27%置信区间(α=0.05)。尽管化学有效,但 FGD 石膏的最大观测水力传导率为 4 L s(-1),但随着时间的推移会降低到<1 L s(-1)。当考虑旁路流量和基流时,沟渠过滤器在 3.6 年的监测期间去除了 TDP 负荷的约 22%。由于维护和清理要求,我们得出结论,FGD 石膏的沟渠过滤在农场规模上是不实际的。然而,我们提出了一种替代设计,由平行于沟渠的充满 FGD 石膏的沟渠组成,以在地下水进入沟渠之前拦截和处理地下水。