Suppr超能文献

格兰克莱德手术室空间焕然一新。

Glan Clwyd operating space is transformed.

作者信息

Baillie Jonathan

出版信息

Health Estate. 2012 Aug;66(7):49-53.

Abstract

Turnkey construction company, MTX Contracts, has recently completed a suite of five 'modern and future-proofed' operating theatres at the Ysbyty Glan Clwyd in Bodelwyddan, Denbighshire, in the first phase of a 90-phase, 89.9 million pounds sterling redevelopment of facilities at the North Wales hospital being undertaken by Laing O'Rourke for the Betsi Cadwaladr University Health Board. According to Dr Eileen Williams, a consultant anaesthetist at the hospital, and the clinical lead on the hospital redevelopment project, the new theatre facilities will enable surgeons to undertake a wide range of surgical procedures, equipped with the most modern technology, in an environment that is not only lighter, brighter, and better laid out than the six previous theatres, but will also improve patient flow, aid infection control, and greatly enhance overall working efficiencies.

摘要

交钥匙工程建设公司MTX Contracts最近在登比郡博德威丹的Ysbyty Glan Clwyd医院完成了一套五个“现代化且面向未来”的手术室,这是Laing O'Rourke为贝西·卡德瓦拉德大学健康委员会在北威尔士医院进行的90阶段、8990万英镑设施重建项目的第一阶段。据该医院的麻醉顾问医生、医院重建项目的临床负责人艾琳·威廉姆斯博士称,新的手术室设施将使外科医生能够在配备最现代技术的环境中进行广泛的外科手术,这个环境不仅比之前的六个手术室更明亮、更宽敞,布局也更好,而且还将改善患者流动,有助于感染控制,并大大提高整体工作效率。

文献检索

告别复杂PubMed语法,用中文像聊天一样搜索,搜遍4000万医学文献。AI智能推荐,让科研检索更轻松。

立即免费搜索

文件翻译

保留排版,准确专业,支持PDF/Word/PPT等文件格式,支持 12+语言互译。

免费翻译文档

深度研究

AI帮你快速写综述,25分钟生成高质量综述,智能提取关键信息,辅助科研写作。

立即免费体验