Dipartimento di Ingegneria dell'Innovazione, Università del Salento, via per Monteroni, 73100 Lecce, Italy.
Waste Manag. 2013 Jul;33(7):1589-94. doi: 10.1016/j.wasman.2013.04.001. Epub 2013 May 9.
Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the definition of shift schedules for both personnel and vehicles. This activity has a great incidence on the tactical and operational cost for companies. In this paper, we propose an integer programming model to find an optimal solution to the integrated problem. The aim is to determine optimal schedules at minimum cost. Moreover, we design a fast and effective heuristic to face large-size problems. Both approaches are tested on data from a real-world case in Southern Italy and compared to the current practice utilized by the company managing the service, showing that simultaneously solving these problems can lead to significant monetary savings.
城市废物管理正成为一项日益复杂的任务,耗费大量资源,并对环境产生重大影响。废物管理系统的设计包括各种活动,其中之一与人员和车辆的班次安排有关。这项活动对公司的战术和运营成本有重大影响。在本文中,我们提出了一个整数规划模型,以找到综合问题的最优解。目标是以最低成本确定最佳时间表。此外,我们设计了一种快速有效的启发式算法来解决大规模问题。这两种方法都在意大利南部一个实际案例的数据上进行了测试,并与管理该服务的公司目前采用的实践进行了比较,结果表明同时解决这些问题可以带来显著的货币节省。