Chen Xi, Akutsu Tatsuya, Tamura Takeyuki, Ching Wai-Ki
Advanced Modelling and Applied Computing Laboratory, Department of Mathematics, The University of Hong Kong, Pokfulam Road, Hong Kong.
Int J Data Min Bioinform. 2013;7(3):322-43. doi: 10.1504/ijdmb.2013.053306.
Boolean Networks (BNs) and Probabilistic Boolean Networks (PBNs) are studied in this paper from the viewpoint of control problems. For BN CONTROL, by applying external control, we propose to derive the network to the desired state within a few time steps. For PBN CONTROL, we propose to find a control sequence such that the network will terminate in the desired state with a maximum probability. Also, we propose to minimise the maximum cost of the terminal state to which the network will enter. We also present a hardness result suggesting that PBN CONTROL is harder than BN CONTROL.
本文从控制问题的角度研究了布尔网络(BNs)和概率布尔网络(PBNs)。对于布尔网络控制,通过施加外部控制,我们提出在几个时间步内将网络推导到期望状态。对于概率布尔网络控制,我们提出找到一个控制序列,使得网络以最大概率终止于期望状态。此外,我们还提出将网络进入的终端状态的最大成本最小化。我们还给出了一个难度结果,表明概率布尔网络控制比布尔网络控制更难。