Ajslev Jeppe Zielinski Nguyen, Persson Roger, Andersen Lars Louis
National Research Centre for the Working Environment, Lersø Parkalle 105, 2100 Copenhagen, Denmark.
Department of Psychology, Lund University, 22100 Lund, Sweden.
Pain Res Treat. 2015;2015:513903. doi: 10.1155/2015/513903. Epub 2015 Oct 28.
Piece rate and performance based wage systems are common in the construction industry. Construction workers are known to have an increased risk of pain and musculoskeletal disorders (MSD). In this cross-sectional questionnaire study, we examined the association between wage system and (1) physical exertion, (2) time pressure, (3) pain, and (4) fatigue. The participants comprised 456 male Danish construction workers working on one of three different wage systems: group based performance wage, individually based performance wage, and time based wage system. The statistical analyses indicated differences between the wage systems in relation to physical exertion (ηp = 0.05) and time pressure (ηp = 0.03) but not to pain or fatigue. Workers on group based performance wage scored higher (i.e., worse) than workers on individual performance based wage and workers with an hourly/monthly wage. In conclusion, group performance based wage was associated with higher levels of physical exertion and time pressure. Accordingly, group performance based wage can be viewed as a factor that has the potential to complicate prevention of MSD among construction workers. Since performance based wage systems are common in many countries across the world, more attention should be paid to the health effects of these types of payment.
计件工资制和绩效工资制在建筑业很常见。众所周知,建筑工人患疼痛和肌肉骨骼疾病(MSD)的风险增加。在这项横断面问卷调查研究中,我们研究了工资制度与(1)体力消耗、(2)时间压力、(3)疼痛和(4)疲劳之间的关联。参与者包括456名丹麦男性建筑工人,他们采用三种不同工资制度中的一种:基于团队的绩效工资、基于个人的绩效工资和计时工资制。统计分析表明,工资制度在体力消耗(ηp = 0.05)和时间压力(ηp = 0.03)方面存在差异,但在疼痛或疲劳方面没有差异。基于团队绩效工资的工人得分高于基于个人绩效工资的工人和按小时/月计酬的工人(即得分更高,也就是情况更糟)。总之,基于团队绩效的工资与更高水平的体力消耗和时间压力相关。因此,基于团队绩效的工资可被视为一个有可能使建筑工人MSD预防工作复杂化的因素。由于绩效工资制度在世界上许多国家都很常见,应更多关注这类薪酬方式对健康的影响。