Won Jongsung, Cheng Jack C P, Lee Ghang
Department of Civil and Environmental Engineering, The Hong Kong University of Science and Technology, Hong Kong, China.
Department of Architectural Engineering, Yonsei University, Seoul 120-749, Republic of Korea.
Waste Manag. 2016 Mar;49:170-180. doi: 10.1016/j.wasman.2015.12.026. Epub 2016 Jan 2.
Waste generated in construction and demolition processes comprised around 50% of the solid waste in South Korea in 2013. Many cases show that design validation based on building information modeling (BIM) is an effective means to reduce the amount of construction waste since construction waste is mainly generated due to improper design and unexpected changes in the design and construction phases. However, the amount of construction waste that could be avoided by adopting BIM-based design validation has been unknown. This paper aims to estimate the amount of construction waste prevented by a BIM-based design validation process based on the amount of construction waste that might be generated due to design errors. Two project cases in South Korea were studied in this paper, with 381 and 136 design errors detected, respectively during the BIM-based design validation. Each design error was categorized according to its cause and the likelihood of detection before construction. The case studies show that BIM-based design validation could prevent 4.3-15.2% of construction waste that might have been generated without using BIM.
2013年,建筑施工及拆除过程中产生的废弃物约占韩国固体废物总量的50%。许多案例表明,基于建筑信息模型(BIM)的设计验证是减少建筑垃圾量的有效手段,因为建筑垃圾主要是由于设计不当以及设计和施工阶段的意外变更而产生的。然而,采用基于BIM的设计验证可避免的建筑垃圾量一直未知。本文旨在根据因设计错误可能产生的建筑垃圾量,估算基于BIM的设计验证过程所防止的建筑垃圾量。本文研究了韩国的两个项目案例,在基于BIM的设计验证过程中分别检测到381个和136个设计错误。每个设计错误都根据其原因和施工前被检测到的可能性进行了分类。案例研究表明,基于BIM的设计验证可以防止4.3%-15.2%的建筑垃圾产生,而如果不使用BIM,这些建筑垃圾可能会产生。