Ogunde Ayodeji O, Ayodele Rachael, Joshua Opeyemi, Nduka David O, Ogunde Abisola, Ogundipe Kunle E, Ogunbayo Babatunde F, Ajao Adekunle M
Department of Building Technology, Covenant University, Ota, Ogun State, Nigeria.
Department of Estate Management, Covenant University, Ota, Ogun State, Nigeria.
Data Brief. 2018 Apr 18;18:1394-1399. doi: 10.1016/j.dib.2018.04.036. eCollection 2018 Jun.
The data article provides the factors that influence the cost; time performance of the Industrialized Building System (IBS), its prospects and challenges. A survey technique was used for this research. Structured Questionnaires were administered to occupants of prefabricated buildings and interviews were conducted with the professionals in the building industry. Statistical Package for Social Sciences (SPSS version20) was used to analyse the data obtained from the questionnaires. The variables were ranked based on Relative Importance Index (RII) calculation. The Data indicated that IBS would be more economical if used for mass production.
该数据文章提供了影响工业化建筑体系(IBS)成本、时间性能的因素,及其前景和挑战。本研究采用了调查技术。对预制建筑的居住者进行了结构化问卷调查,并对建筑行业的专业人士进行了访谈。使用社会科学统计软件包(SPSS 20版)对问卷中获取的数据进行分析。根据相对重要性指数(RII)计算对变量进行排名。数据表明,如果用于大规模生产,工业化建筑体系将更具经济性。