Suppr超能文献

2019 年 7-8 月爆发性喷发阶段的地球物理前兆及其对斯特龙博利火山(意大利)监测的启示。

Geophysical precursors of the July-August 2019 paroxysmal eruptive phase and their implications for Stromboli volcano (Italy) monitoring.

机构信息

Istituto Nazionale di Geofisica e Vulcanologia, Osservatorio Vesuviano, Napoli, Italy.

Observatorio Geofísico Central, Instituto Geográfico Nacional (IGN), Madrid, Spain.

出版信息

Sci Rep. 2020 Jun 24;10(1):10296. doi: 10.1038/s41598-020-67220-1.

Abstract

Two paroxysmal explosions occurred at Stromboli volcano in the Summer 2019, the first of which, on July 3, caused one fatality and some injuries. Within the 56 days between the two paroxysmal explosions, effusive activity from vents located in the summit area of the volcano occurred. No significant changes in routinely monitored parameters were detected before the paroxysmal explosions. However, we have calculated the polarization and the fractal dimension time series of the seismic signals from November 15, 2018 to September 15, 2019 and we have recognized variations that preceded the paroxysmal activity. In addition, we have defined a new parameter, based on RSAM estimation, related to the Very Long Period events, called VLP size, by means of which we have noticed significant variations through the whole month preceding the paroxysm of July 3. In the short term, we have analyzed the signals of a borehole strainmeter installed on the island, obtaining automatic triggers 10 minutes and 7.5 minutes before the July 3 and the August 28 paroxysms, respectively. The results of this study highlight mid-term seismic precursors of paroxysmal activity and provide valuable evidence for the development of an early warning system for paroxysmal explosions based on strainmeter measurements.

摘要

2019 年夏季,斯特龙博利火山发生了两次阵发性爆炸,其中第一次发生在 7 月 3 日,造成一人死亡和一些人员受伤。在两次阵发性爆炸之间的 56 天内,火山山顶区域的喷口发生了喷发活动。在阵发性爆炸之前,没有检测到常规监测参数的显著变化。然而,我们计算了 2018 年 11 月 15 日至 2019 年 9 月 15 日地震信号的偏振和分形维时间序列,并识别出了在阵发性活动之前的变化。此外,我们基于 RSAM 估计定义了一个新参数,与非常长周期事件相关,称为 VLP 大小,通过该参数,我们注意到在 7 月 3 日爆发之前的整个月份都有显著的变化。在短期内,我们分析了安装在该岛上的钻孔应变仪的信号,在 7 月 3 日和 8 月 28 日的爆发前分别获得了 10 分钟和 7.5 分钟的自动触发。这项研究的结果突出了阵发性活动的中期地震前兆,并为基于应变仪测量的阵发性爆炸预警系统的开发提供了有价值的证据。

https://cdn.ncbi.nlm.nih.gov/pmc/blobs/e27c/7314781/3b92c786e588/41598_2020_67220_Fig1_HTML.jpg

文献AI研究员

20分钟写一篇综述,助力文献阅读效率提升50倍。

立即体验

用中文搜PubMed

大模型驱动的PubMed中文搜索引擎

马上搜索

文档翻译

学术文献翻译模型,支持多种主流文档格式。

立即体验