Ibrahim Dahi Ghareab Abdelsalam
Engineering and Surface Metrology Laboratory, National Institute of Standards, El haram, El Giza, Egypt.
J Microsc. 2021 Jun;282(3):224-238. doi: 10.1111/jmi.12997. Epub 2021 Jan 29.
In this paper, the uncertainty budget from 10 sources we claim they have direct impact on measurement is estimated. The measurement has been applied to nominal step heights of 1.34 and 1.50 μm using a dual-wavelength Twyman-Green interferometer. Experimental results show that the measured step heights match with their nominal values with expanded uncertainty in the range of 5% from the object being measured. The performance of the measurement process over time has been estimated at different confidence levels and the obtained results show that the process is maintained in a state of statistical control. To the best of our knowledge, this is the first report for estimation of uncertainty budget from a synthetic wavelength.
在本文中,我们估算了我们声称对测量有直接影响的10个来源的不确定度预算。使用双波长泰曼-格林干涉仪对1.34和1.50μm的标称台阶高度进行了测量。实验结果表明,测量得到的台阶高度与标称值相符,扩展不确定度在被测量物体的5%范围内。在不同置信水平下估算了测量过程随时间的性能,所得结果表明该过程保持在统计控制状态。据我们所知,这是第一份关于合成波长不确定度预算估算的报告。