Department of Civil Engineering, Monash University, Melbourne, Victoria, Australia.
School of Property, Construction and Project Management, RMIT University, Victoria, Australia.
Risk Anal. 2022 Oct;42(10):2312-2326. doi: 10.1111/risa.13865. Epub 2021 Nov 27.
The construction sector is vulnerable to safety risk incidents due to its dynamic nature. Although numerous research efforts and technological advancements have focused on addressing workplace injuries, most of the studies perform empirical and deterministic postimpact evaluations on construction project performance. The effective modeling of the safety risk impacts on project performance provides decisionmakers with a valuable tool toward incidents prevention and proper safety risk management. Therefore, this study collected Australian incident records from the construction industry from 2016 onwards and conducted discrete event simulation to quantitatively measure the impact of safety risk incidents on project cost performance. Moreover, this study investigated the correlation between safety risk incidents and the age of injured workers. The findings show a strong correlation between the middle-aged workforce and the severity of incidents on project cost overruns. The ex-ante, nondeterministic analysis of safety risk impacts on project performance provides insightful results that will advance safety management theory in the direction of achieving zero harm workplace environments.
建筑行业由于其动态性质,容易发生安全风险事件。尽管已经有大量的研究工作和技术进步致力于解决工作场所伤害问题,但大多数研究都是对建筑项目绩效进行经验和确定性的事后影响评估。对安全风险对项目绩效的影响进行有效建模,可以为决策者提供一种预防事故和进行适当安全风险管理的有价值工具。因此,本研究从 2016 年开始收集澳大利亚建筑行业的事故记录,并进行离散事件模拟,以定量衡量安全风险事件对项目成本绩效的影响。此外,本研究还调查了安全风险事件与受伤工人年龄之间的相关性。研究结果表明,中年劳动力与项目成本超支严重程度之间存在很强的相关性。对安全风险对项目绩效的事前、非确定性影响进行分析,可以提供有见地的结果,从而推动安全管理理论朝着实现零伤害工作环境的方向发展。