Suppr超能文献

重新计算运行现代化辅助生殖技术实验室所需的人员数量。

Recalculating the staff required to run a modern assisted reproductive technology laboratory.

机构信息

Central Laboratory/Assisted Human Reproduction Unit, Complexo Hospitalario Universitario de Santiago de Compostela (CHUS), SERGAS, Santiago de Compostela, Spain.

Reproductive Medicine Unit, Consorcio Hospital General Universitario de Valencia, Valencia, Spain.

出版信息

Hum Reprod. 2022 Jul 30;37(8):1774-1785. doi: 10.1093/humrep/deac121.

Abstract

STUDY QUESTION

What number of staff is sufficient to perform increasingly complicated processes in today's modern ART laboratories?

SUMMARY ANSWER

The adequate number of personnel required for the efficient and safe operation of modern ART laboratories needs to be calculated.

WHAT IS KNOWN ALREADY

In today's modern ART laboratories, the amount of time required to perform increasingly complicated processes has more than doubled, with a downward trend in the amount of work an embryologist can do. Different workload unit values have been used to evaluate each workload task and efficiency in a particular ART laboratory, as well as to occasionally compare one laboratory with another.

STUDY DESIGN, SIZE, DURATION: Seven senior embryologists working at different IVF centers, three public and four private centers, participated in this multicenter study conducted between 2019 and 2020. We prepared a survey to create a calculator for staff using the average (of three attempts) time spent in every laboratory by each embryologist of the center to perform any ART process.

PARTICIPANTS/MATERIALS, SETTING, METHODS: Different laboratory processes and activities related to quality control, time spent and conventional human double witnessing were included in the survey. To calculate the number of processes that each embryologist can perform per year, an embryologist was considered to be having a full-time contract and working 7 or 8 h/day. The times included in the calculation of each task were those corresponding to the 95th percentile. For the calculations, Microsoft® Office Excel® Professional Plus 2019 was used.

MAIN RESULTS AND THE ROLE OF CHANCE

The survey showed that the time needed per embryologist to perform the different processes necessary for a classic IVF cycle without time lapse (TL) was 8.11 h, and with TL, it was 10.27 h. The calculated time also considered the time spent in documentation handling, cycle preparation, database management and conventional human double witnessing verification. An ICSI without TL needed 8.55 h, and with TL, it needed 10.71 h. An ICSI-PGT without a TL cycle needed 11.75 h, and with TL, it needed 13.91 h. Furthermore, 1.81 h should be added for every vitrification support needed. The time needed to control more than 200 critical steps, including equipment control and culture parameters, was 30 min per day plus 3.9 min per device to control.The time spent in semen analysis (including documentation handling, cycle preparation and database management) or intrauterine insemination with a partner sperm was 2.7 h. For donor sperm, an additional hour was required for the management involved. The time required to perform a testicular biopsy and cryopreserve the sample was 4 h. Similarly, the time required to perform seminal cryopreservation was 3.7 h.

LIMITATIONS, REASONS FOR CAUTION: The study was conducted considering a full-time contract embryologist working 7 or 8 h/day, 5 days a week, with days off according to the Spanish regulations. However, our findings can be adapted to foreign regulations using the developed online calculation platform.

WIDER IMPLICATIONS OF THE FINDINGS

A new advanced staff calculator allows any IVF laboratory to estimate the minimum number of embryologists necessary without compromising the security or success of the results. Nevertheless, we recommend a minimum of two qualified embryologists in every laboratory, regardless of the workload.

STUDY FUNDING/COMPETING INTEREST(S): This work was funded by the Asociación para el Estudio de la Biología de la Reproducción (ASEBIR). None of the authors has any conflict of interest to declare.

TRIAL REGISTRATION NUMBER

N/A.

摘要

研究问题

在当今现代 ART 实验室中,需要多少员工才能完成日益复杂的流程?

总结答案

需要计算现代 ART 实验室高效安全运行所需的人员数量。

已知信息

在当今的现代 ART 实验室中,执行日益复杂的过程所需的时间增加了一倍以上,胚胎学家的工作量呈下降趋势。不同的工作量单位值已被用于评估特定 ART 实验室中的每个工作量任务和效率,并偶尔用于比较一个实验室与另一个实验室。

研究设计、规模、持续时间:2019 年至 2020 年期间,7 名资深胚胎学家在不同的试管婴儿中心(3 个公立和 4 个私立中心)参与了这项多中心研究。我们准备了一项调查,为每个胚胎学家在每个实验室执行任何 ART 过程的平均(三次尝试)时间创建一个计算器,为员工提供计算器。

参与者/材料、设置、方法:调查包括与质量控制、时间花费和常规人类双重见证相关的不同实验室过程和活动。为了计算每个胚胎学家每年可以执行的过程数量,假设胚胎学家有一份全职合同,每天工作 7 或 8 小时。计算每个任务的时间包括对应于第 95 个百分位的时间。计算使用了 Microsoft® Office Excel® Professional Plus 2019。

主要结果和机会的作用

调查显示,进行一个经典的没有时间延迟(TL)的体外受精周期所需的每个胚胎学家的时间为 8.11 小时,而有 TL 时则为 10.27 小时。计算时间还考虑了文档处理、周期准备、数据库管理和常规人类双重见证验证的时间。没有 TL 的 ICSI 需要 8.55 小时,而有 TL 时则需要 10.71 小时。没有 TL 周期的 ICSI-PGT 需要 11.75 小时,而有 TL 时则需要 13.91 小时。此外,每增加一次玻璃化支持,还需要增加 1.81 小时。每天需要 30 分钟加上 3.9 分钟来控制 200 多个关键步骤,包括设备控制和培养参数。精液分析(包括文档处理、周期准备和数据库管理)或与伴侣精子的宫内人工授精所花费的时间为 2.7 小时。对于供精,管理所需的额外时间为 1 小时。进行睾丸活检并冷冻保存样本所需的时间为 4 小时。同样,进行精液冷冻保存所需的时间为 3.7 小时。

局限性、谨慎的原因:该研究是在考虑每周工作 5 天、每天工作 7 或 8 小时、根据西班牙法规休息的全职合同胚胎学家的情况下进行的。然而,我们的发现可以使用开发的在线计算平台根据外国法规进行调整。

研究结果的更广泛影响

一个新的高级员工计算器允许任何试管婴儿实验室在不影响结果的安全性或成功率的情况下估计所需的最低胚胎学家人数。然而,我们建议每个实验室至少有两名合格的胚胎学家,无论工作量如何。

研究资金/利益冲突:这项工作由 Asociación para el Estudio de la Biología de la Reproducción(ASEBIR)资助。作者均无利益冲突需要声明。

试验注册编号

无。

文献AI研究员

20分钟写一篇综述,助力文献阅读效率提升50倍。

立即体验

用中文搜PubMed

大模型驱动的PubMed中文搜索引擎

马上搜索

文档翻译

学术文献翻译模型,支持多种主流文档格式。

立即体验