McManus Michael G, Nietch Christopher T, Heberling Matthew T, Gains-Germain Leslie
Center for Environmental Measurement and Modeling, Office of Research and Development, United States Environmental Protection Agency, Cincinnati, OH, USA.
Neptune and Company, Inc., Los Alamos, NM, USA.
J Great Lakes Res. 2023 Jun 1;49(3):608-620. doi: 10.1016/j.jglr.2023.03.011.
Using the US EPA's Grants Reporting and Tracking System (GRTS), we test if completion of best management practices (BMPs) through the Clean Water Act Section (§)319 National Nonpoint Source Program was associated with a decreasing trend in total suspended solids (TSS) load (metric tons/year). The study area chosen had 21 completed projects in the Cuyahoga River watershed in northeastern Ohio from 2000 to 2018. The §319 projects ranged from dam removal, floodplain/wetland restoration to stormwater projects. There was an overall decreasing trend in TSS loads. We identified three phases of project implementation and completion, where phase 1 had ongoing projects, but none completed (2000-2004). The steepest decrease in loads, identified as phase 2 (2005-2011), was associated with completion of low-head dam modification and removal projects on the mainstem of the Cuyahoga River. A likely decreasing trend was associated with projects completed in the tributaries, such as natural channel design restoration and stormwater green infrastructure (phase 3). Pairing sediment reduction estimates from projects with the river's flow normalized TSS loading trend, we estimated that the §319 effort may account for a small fraction of the TSS load reduction. Other stream restoration projects (non-§319) have also been done in the Cuyahoga watershed by other organizations. However, trying to compile these other projects is challenging in larger watersheds having multiple municipalities, agencies, and nonprofits doing restoration without better coordinated record keeping and monitoring. While a decreasing trend in a pollutant load is a desirable water quality outcome, determining what contributed to that trend remains difficult.
利用美国环境保护局的赠款报告与跟踪系统(GRTS),我们测试了通过《清洁水法》第319条国家非点源项目完成最佳管理实践(BMPs)是否与总悬浮固体(TSS)负荷(公吨/年)的下降趋势相关。选定的研究区域在2000年至2018年期间,在俄亥俄州东北部的凯霍加河流域有21个已完成项目。第319条项目范围从拆除水坝、恢复洪泛区/湿地到雨水项目。TSS负荷总体呈下降趋势。我们确定了项目实施和完成的三个阶段,其中第一阶段有正在进行的项目,但没有完成的项目(2000 - 2004年)。负荷下降最陡峭的阶段被确定为第二阶段(2005 - 2011年),这与凯霍加河干流上低水头水坝拆除项目的完成有关。支流中完成的项目,如自然河道设计恢复和雨水绿色基础设施项目(第三阶段),可能呈现下降趋势。将项目的沉积物减少估计值与河流流量归一化的TSS负荷趋势相结合,我们估计第319条项目的努力可能只占TSS负荷减少量的一小部分。其他组织也在凯霍加河流域开展了其他河流恢复项目(非第319条项目)。然而,在有多个市政当局、机构和非营利组织进行恢复且没有更好的协调记录保存和监测的较大流域中,试图汇总这些其他项目具有挑战性。虽然污染物负荷下降趋势是理想的水质结果,但确定导致该趋势的因素仍然困难。