Nelson R E, Barnes G T, Witten D M
Radiol Technol. 1977 Sep-Oct;49(2):129-34.
The quality assurance program at The University of Alabama in Birmingham is briefly reviewed and its economic efficacy examined. The development of the program was the result of the cooperative effort of the quality control technologists, the radiological service engineering staff, and the radiation physicists. Analysis of our film and chemistry consumption before and after the program was established indicates that its implementation has saved the hospital approximately $27,000 per year after personnel cost for the last four years. A further $32,000 to $55,000 savings per year is realized by having in house rather than contracted service.
简要回顾了阿拉巴马大学伯明翰分校的质量保证计划,并对其经济效益进行了考察。该计划的制定是质量控制技术人员、放射服务工程人员和辐射物理学家共同努力的结果。对该计划实施前后胶片和化学用品消耗情况的分析表明,在过去四年中,该计划的实施每年为医院节省了约27,000美元的人员成本。通过采用内部服务而非外包服务,每年还可进一步节省32,000至55,000美元。