Suppr超能文献

图像质量保证计划分析

Analysis of an image quality assurance program.

作者信息

Göthlin J H, Alders B

出版信息

Eur J Radiol. 1985 Aug;5(3):228-30.

PMID:4029161
Abstract

Reject film analysis before and after the introduction of a quality assurance program showed a 45% decrease in rejected films. The main changes in equipment and routines were: Increased control of film processors and X-ray generators. New film cassettes and screens. Decreased number of film sizes. Information to and supervision of radiographing personnel. Savings in costs and increased income from an increased amount of out-patients corresponded to about 4.5% of the total cost of operating and maintaining the department.

摘要

在引入质量保证计划前后进行的废片分析显示,废片数量减少了45%。设备和流程的主要变化包括:加强对洗片机和X射线发生器的控制;采用新的暗盒和增感屏;减少胶片尺寸种类;向放射摄影人员提供信息并进行监督。成本节约以及门诊量增加带来的收入增长相当于该科室运营和维护总成本的约4.5%。

文献AI研究员

20分钟写一篇综述,助力文献阅读效率提升50倍。

立即体验

用中文搜PubMed

大模型驱动的PubMed中文搜索引擎

马上搜索

文档翻译

学术文献翻译模型,支持多种主流文档格式。

立即体验