Nkwawir Siyem C, Batumani Nakeli N, Maruta Talkmore, Awasom Charles N
Bamenda Regional Hospital Laboratory, Cameroon.
African Society for Laboratory Medicine, Ethiopia.
Afr J Lab Med. 2014 Nov 3;3(2):203. doi: 10.4102/ajlm.v3i2.203. eCollection 2014.
Public health laboratories form the foundation on which today's clinical laboratory practice in Cameroon is built. The advent of the Strengthening Laboratory Management Toward Accreditation (SLMTA) programme in 2009 empowered the Bamenda Regional Hospital Laboratory (BRHL) to improve its working culture, practices and management.
To evaluate the results of SLMTA implementation at BRHL and discuss lessons learned.
In 2010, the SLMTA programme was rolled out in Cameroon to improve laboratory quality management systems in five laboratories, including BRHL. Three workshops were conducted (the first centralised, the remaining two on-site at each laboratory) and improvement projects were implemented after each workshop with the assistance of mentors. Audits were used in order to evaluate performance and to identify areas for further improvement.
BRHL had the lowest score (18%) amongst the cohort at the baseline audit and the highest (81%) at the official Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA) audit conducted in August 2013 by the African Society for Laboratory Medicine. Improvements were observed in each of the 12 Quality System Essentials; improvement was especially noteworthy in the areas of facilities and safety, and purchasing and inventory. Staff investment and pride in the quality of laboratory services increased.
BRHL's remarkable improvement was achieved with a combination of SLMTA training activities, intensive on-site mentorship and the collective focus of all laboratory staff. The experience at Bamenda Hospital illustrates what can be achieved when a laboratory successfully harnesses the energy of its staff and implements changes to improve the quality of services in a transformation taking them from grass to grace.
公共卫生实验室构成了喀麦隆当今临床实验室实践的基础。2009年加强实验室管理以实现认证(SLMTA)计划的出现,使巴门达地区医院实验室(BRHL)得以改善其工作文化、实践和管理。
评估BRHL实施SLMTA的结果并讨论经验教训。
2010年,SLMTA计划在喀麦隆推出,以改善包括BRHL在内的五个实验室的实验室质量管理体系。举办了三次研讨会(第一次集中进行,其余两次在每个实验室现场进行),并在每次研讨会后在导师的协助下实施改进项目。通过审核来评估绩效并确定需要进一步改进的领域。
在基线审核中,BRHL在该队列中的得分最低(18%),而在2013年8月由非洲检验医学学会进行的正式逐步实验室质量改进以实现认证(SLIPTA)审核中得分最高(81%)。在12项质量体系要素中的每一项都有改进;在设施与安全以及采购与库存领域的改进尤为显著。工作人员对实验室服务质量的投入和自豪感有所增加。
BRHL通过SLMTA培训活动、强化现场指导以及所有实验室工作人员的共同努力实现了显著改进。巴门达医院的经验表明,当一个实验室成功激发员工的能量并实施变革以改善服务质量,使其从平凡走向卓越时能够取得怎样的成就。