Implementations of construction projects in Indonesia, especially in Aceh Province, are often delayed. Time, quality, and cost are three important components of planning a construction project. The benchmark for a successful construction project is the project completion time being in accordance with the time period specified in the contract. In project implementation, there is often a risk of delays in completing construction projects that can cause losses and fines; therefore, it is necessary to know the risk factors potentially causing project delays. The purpose of this study was to identify the risk factors causing delays greatly affecting construction projects in Aceh Province. The data used in this study were questionnaire data distributed to 68 respondents. The data processing methods included validity tests, reliability tests, and the construction of descriptive statistics. Ultimately, 60 delay factors were obtained; of these, 30 risk indicators were included in the very influential category with a mode value of (= 5), 29 delay risk indicators were in the high influence category with a mode value of (= 4), and one indicator was included in the category of medium influence (= 3).
印度尼西亚,特别是亚齐省的建筑项目实施经常会延迟。时间、质量和成本是规划建筑项目的三个重要组成部分。成功的建筑项目的基准是项目完成时间符合合同中规定的时间期限。在项目实施过程中,经常存在建设项目完成延迟的风险,这可能导致损失和罚款;因此,有必要了解潜在导致项目延迟的风险因素。本研究的目的是确定对亚齐省建筑项目造成重大延误的风险因素。本研究使用的是向 68 位受访者分发的问卷调查数据。数据处理方法包括有效性检验、可靠性检验和描述性统计的构建。最终,获得了 60 个延误因素,其中 30 个风险指标属于非常有影响的类别,其模式值为 (=5),29 个延误风险指标属于高影响类别,模式值为 (=4),一个指标属于中等影响类别 (=3)。