School of Civil Engineering, Southwest Jiaotong University, Chengdu, 610031, China.
School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang, 050043, China.
Sci Rep. 2023 Jun 17;13(1):9843. doi: 10.1038/s41598-023-37067-3.
The underground pipeline network in the city is so intertwined that the concealed excavation of a metro station inevitably leads to a series of underground pipelines, causing settlement deformation and further risk of leakage. The existing theoretical methods for analysing settlement deformation are mostly for circular chambers, whereas metro stations have a nearly square cross-sectional form and different construction methods are very different, which have a greater impact on the deformation of the overlying pipelines. In this paper, based on the random medium theory and Peck's formula, the improved random medium model for predicting ground deformation is modified, the correction coefficients λ and η for the influence of different construction methods are proposed, the prediction model of underground pipeline deformation under different construction methods is obtained, and the numerical models of four work methods commonly used in urban tunnel construction: pillar hole method, side hole method, middle hole method and Pile-Beam-Arch (PBA) method are constructed through simulation, and the mathematical analysis software was used to fit the results to the model and obtain the range of correction coefficients λ and η for each of the four methods, and the accuracy and applicability of the theoretical model was verified by combining with actual engineering cases. The influence on the overlying pipes is in descending order: side hole method, pillar hole method, middle hole method and PBA method. The theoretical model provided in this paper for predicting the deformation of pipes in any overlying strata of the tunnel is well suited to the actual project and has a high degree of correlation with the measured results.
城市地下管网错综复杂,地铁车站的暗挖不可避免地会涉及到一系列地下管线,导致沉降变形,进一步增加泄漏风险。现有的沉降变形分析理论方法大多针对圆形硐室,而地铁车站的横截面形式接近方形,且施工方法差异较大,对上方管线的变形影响更大。本文基于随机介质理论和 Peck 公式,对预测地面变形的改进随机介质模型进行修正,提出不同施工方法影响的修正系数λ和η,得到不同施工方法下地下管线变形的预测模型,并通过模拟构建了城市隧道施工中常用的四种工法(柱洞法、侧洞法、中洞法和 PBA 法)的数值模型,使用数学分析软件对结果进行拟合,得到四种方法各自的修正系数λ和η的取值范围,并结合实际工程案例验证了理论模型的准确性和适用性。对上方管线的影响程度依次为:侧洞法、柱洞法、中洞法和 PBA 法。本文提供的预测隧道任何上覆地层中管道变形的理论模型非常适合实际工程,与实测结果相关性较高。