Johnson A P, Dowdall T, Brown M C, Hammond P E
J Med Eng Technol. 1985 Sep-Oct;9(5):218-26. doi: 10.3109/03091908509032102.
Equipment management arrangements in hospitals, including safety and function testing, relating to continuous-flow anaesthetic apparatus have been found wanting following examination of a number of recent incidents. A problem exists with the complexity of the tests required and the number of necessary test instruments. In this article the required tests are examined, and a specially designed test set to make fuller testing a practical proposition for hospital staff and for manufacturers' service technicians is described.
在对近期多起事件进行调查后发现,医院中与连续流麻醉设备相关的设备管理安排存在不足,包括安全和功能测试方面。所需测试的复杂性以及必要测试仪器的数量存在问题。本文对所需测试进行了研究,并介绍了一种专门设计的测试装置,以使更全面的测试对医院工作人员和制造商的维修技术人员而言成为一项切实可行的方案。