Maleki Toulabi Amir Mohammad, Pourrostam Towhid, Aminnejad Babak
Department of Civil Engineering, Qeshm Branch, Islamic Azad University, Qeshm, Iran.
Department of Civil Engineering, Central Tehran Branch, Islamic Azad University, Tehran, Iran.
Heliyon. 2024 Sep 21;10(19):e38240. doi: 10.1016/j.heliyon.2024.e38240. eCollection 2024 Oct 15.
Construction operation is among the most high-risk sectors in terms of work-related accident, making it highly challenging to surveil the safety of such projects. In construction projects, failure to observe safety represents a leading cause of fatal accidents, not to mention the losses incurred by such accidents to national assets of the country. Accordingly, recent decades have witnessed the emergence of modern techniques for improving the occupational safety of construction projects. The main purpose of the present research is to identify and classify different preventable risk mitigation factors in mass housing projects following a building information modeling (BIM) approach. The research methodology included interviews with relevant experts and elites followed by analysis of the data on the 12 identified-as-significant variables for mitigating the preventable risk factors in mass house construction projects by means of the inferential - structural modeling (ISM) in MICMAC software. In order to explore the relationships among and succession of different criteria and further classify them at different levels, ISM was implemented, with the MICMAC software used to analyze the direct and indirect influences, develop influence/dependence maps, and judge about the role of each criterion. Findings of the present research showed that the mutual relations (H3), the reward system (H6), the reporting system (H7), and the supervisors' supervision (H8) are autonomous variables and hence impose the smallest contributions to the system. Accordingly, they can be eliminated from the model though their effects may not be completely ignored. On the other hand, the employees' empowering (H4), the safety management system (H5), the teamwork (H9), the self-efficiency (H10), and the knowledge and awareness (H11) were identified as the linkage variables that fill in the gap between the safety and occupational accident reduction in the mass house construction projects. Further, the continuous improvement (H2) and the safe behavior (H12) were identified as dependent variables, implying that they exhibit the weakest influence coupled with highest dependence on any change in the conditions of the system. Last but not the least, the management commitment (H1) was identified as the only dependent variable which deserves lots of attention. This information can be helpful to safety decision-makers, end users, research organizations, and academic institutes who work to reduce the preventable risk factors in mass house construction projects.
就与工作相关的事故而言,建筑施工操作属于风险最高的行业之一,因此对这类项目的安全进行监管极具挑战性。在建筑项目中,忽视安全是致命事故的主要原因,更不用说此类事故给国家资产造成的损失了。因此,近几十年来出现了一些用于提高建筑项目职业安全的现代技术。本研究的主要目的是采用建筑信息模型(BIM)方法,识别和分类大规模住房项目中不同的可预防风险缓解因素。研究方法包括与相关专家和精英进行访谈,然后通过MICMAC软件中的推理结构建模(ISM),分析12个已确定的对缓解大规模房屋建设项目中可预防风险因素具有重要意义的变量的数据。为了探究不同标准之间的关系及其先后顺序,并在不同层面上对其进行进一步分类,实施了ISM,使用MICMAC软件分析直接和间接影响、绘制影响/依赖关系图,并判断每个标准的作用。本研究结果表明,相互关系(H3)、奖励制度(H6)、报告制度(H7)和主管监督(H8)是自主变量,因此对系统的贡献最小。因此,尽管它们的影响可能不能完全忽略,但可以从模型中剔除。另一方面,员工赋权(H4)、安全管理体系(H5)、团队合作(H9)、自我效能(H10)以及知识与意识(H11)被确定为连接变量,填补了大规模房屋建设项目中安全与减少职业事故之间的差距。此外,持续改进(H2)和安全行为(H12)被确定为因变量,这意味着它们表现出最弱的影响,并且对系统条件的任何变化具有最高的依赖性。最后但同样重要的是,管理承诺(H1)被确定为唯一值得高度关注的因变量。这些信息对致力于减少大规模房屋建设项目中可预防风险因素的安全决策者、最终用户、研究机构和学术机构可能会有所帮助。