Suppr超能文献

The bone-cement interface temperature during total joint replacement.

作者信息

Reckling F W, Dillon W L

出版信息

J Bone Joint Surg Am. 1977 Jan;59(1):80-2.

PMID:833181
Abstract

Sets of thermoprobe measurements of the temperature of the bone-cement interface were made during twenty total joint-replacement procedures. Although the range of rise in temperature was wide, from 3 to 17 degrees centigrade, the highest temperature obtained was 48 degrees centigrade, which is well below the denaturation point (56 degrees centigrade) of proteins. Several factors, such as the presence of blood and moisture at the interface and the large surface area and poor heat conductivity of methylmethacrylate, prevent the interface from experiencing the high rise in temperature that occurs at the center of the polymerizing cement mass.

摘要

文献检索

告别复杂PubMed语法,用中文像聊天一样搜索,搜遍4000万医学文献。AI智能推荐,让科研检索更轻松。

立即免费搜索

文件翻译

保留排版,准确专业,支持PDF/Word/PPT等文件格式,支持 12+语言互译。

免费翻译文档

深度研究

AI帮你快速写综述,25分钟生成高质量综述,智能提取关键信息,辅助科研写作。

立即免费体验