• 文献检索
  • 文档翻译
  • 深度研究
  • 学术资讯
  • Suppr Zotero 插件Zotero 插件
  • 邀请有礼
  • 套餐&价格
  • 历史记录
应用&插件
Suppr Zotero 插件Zotero 插件浏览器插件Mac 客户端Windows 客户端微信小程序
定价
高级版会员购买积分包购买API积分包
服务
文献检索文档翻译深度研究API 文档MCP 服务
关于我们
关于 Suppr公司介绍联系我们用户协议隐私条款
关注我们

Suppr 超能文献

核心技术专利:CN118964589B侵权必究
粤ICP备2023148730 号-1Suppr @ 2026

文献检索

告别复杂PubMed语法,用中文像聊天一样搜索,搜遍4000万医学文献。AI智能推荐,让科研检索更轻松。

立即免费搜索

文件翻译

保留排版,准确专业,支持PDF/Word/PPT等文件格式,支持 12+语言互译。

免费翻译文档

深度研究

AI帮你快速写综述,25分钟生成高质量综述,智能提取关键信息,辅助科研写作。

立即免费体验

IEC 61511 and the capital project process--a protective management system approach.

作者信息

Summers Angela E

机构信息

SIS-TECH, Houston, TX 77034, USA.

出版信息

J Hazard Mater. 2006 Mar 17;130(1-2):28-32. doi: 10.1016/j.jhazmat.2005.07.063. Epub 2005 Oct 24.

DOI:10.1016/j.jhazmat.2005.07.063
PMID:16246491
Abstract

This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.

摘要

相似文献

1
IEC 61511 and the capital project process--a protective management system approach.
J Hazard Mater. 2006 Mar 17;130(1-2):28-32. doi: 10.1016/j.jhazmat.2005.07.063. Epub 2005 Oct 24.
2
Lessons learned from process incident databases and the process safety incident database (PSID) approach sponsored by the Center for Chemical Process Safety.
J Hazard Mater. 2006 Mar 17;130(1-2):9-14. doi: 10.1016/j.jhazmat.2005.07.061. Epub 2005 Sep 13.
3
Best practices in incident investigation in the chemical process industries with examples from the industry sector and specifically from Nova Chemicals.化工行业事故调查的最佳实践,并列举行业领域特别是诺瓦化学公司的实例。
J Hazard Mater. 2004 Jul 26;111(1-3):161-6. doi: 10.1016/j.jhazmat.2004.02.051.
4
Interface management: effective communication to improve process safety.界面管理:通过有效沟通提高过程安全性。
J Hazard Mater. 2006 Mar 31;130(3):321-5. doi: 10.1016/j.jhazmat.2005.07.009. Epub 2005 Aug 29.
5
Development of a security vulnerability assessment process for the RAMCAP chemical sector.为RAMCAP化工行业开发安全漏洞评估流程。
J Hazard Mater. 2007 Apr 11;142(3):689-94. doi: 10.1016/j.jhazmat.2006.06.133. Epub 2006 Jul 6.
6
A quality process for chemical product risk assessment.
Qual Assur. 1992 Oct;1(4):295-301.
7
Innovative safety valve selection techniques and data.创新的安全阀选型技术与数据。
J Hazard Mater. 2007 Apr 11;142(3):685-8. doi: 10.1016/j.jhazmat.2006.06.072. Epub 2006 Jun 27.
8
A risk management initiative implemented in Canada.在加拿大实施的一项风险管理举措。
J Hazard Mater. 2006 Mar 31;130(3):311-20. doi: 10.1016/j.jhazmat.2005.07.008. Epub 2005 Aug 24.
9
Procedures and methods of benefit assessments for medicines in Germany.德国药品效益评估的程序和方法。
Eur J Health Econ. 2008 Nov;9 Suppl 1:5-29. doi: 10.1007/s10198-008-0122-5.
10
ARAMIS project: a comprehensive methodology for the identification of reference accident scenarios in process industries.ARAMIS项目:一种用于识别流程工业中参考事故场景的综合方法。
J Hazard Mater. 2006 Mar 31;130(3):200-19. doi: 10.1016/j.jhazmat.2005.07.005. Epub 2005 Aug 26.