Barrett G V, Greenawalt J P, Thornton C I, Williamson T R
Percept Mot Skills. 1977 Jun;44(3 Pt 1):875-80. doi: 10.2466/pms.1977.44.3.875.
Four types of training techniques were compared in the training of a perceptual concept-formation task. Adaptive training, a technique in which one parameter in the learning situation is varied so that the difficulty of a learning task remains constant for that individual, was compared to three intermediate approaches to training (self-adaptive, in which the trainees could control their own pace of learning by indicating when they felt they had mastered the problem, fixed sequence, and fixed task). The relationship between individual trainee's perceptual style and various stages of training was also investigated. Perceptual style was measured by the Hidden Figures Test, the Rod-and-frame Test, a Distracting Context Test, and a Cancellation Test. Results showed a definite (time to perform the task) advantage in favor of the adaptive training method. Fewer errors were committed under the self-adaptive approach, but the task completion time was significantly higher. Further analysis showed that for the adaptive-training group, measures of perceptual style could be used as predictors of future task success. No such relationship was found for other training techniques. In particular, field-independence appears to be important early in training but becomes increasingly less important, and for the final training criterion trials, is not predictive of performance. In contrast, the Distracting Contest Test-II, early in training, is not an important predictor but is an important predictor for the final criterion trials.
在一项知觉概念形成任务的训练中,对四种训练技术进行了比较。适应性训练是一种在学习情境中改变一个参数,以使学习任务对个体而言难度保持恒定的技术,将其与三种中间训练方法(自我适应性训练,即学员可以通过表明自己何时觉得已掌握问题来控制自己的学习进度;固定顺序训练;固定任务训练)进行了比较。还研究了个体学员的知觉风格与训练各阶段之间的关系。知觉风格通过隐蔽图形测试、棒框测试、干扰情境测试和划消测试来衡量。结果显示,在(完成任务的时间)方面,适应性训练方法具有明显优势。在自我适应性训练方法下错误较少,但任务完成时间显著更长。进一步分析表明,对于适应性训练组,知觉风格的测量可以用作未来任务成功的预测指标。对于其他训练技术则未发现这种关系。特别是,场独立性在训练初期似乎很重要,但重要性逐渐降低,对于最终训练标准试验,它并不能预测表现。相比之下,干扰情境测试 - II在训练初期不是一个重要的预测指标,但对于最终标准试验却是一个重要的预测指标。